{"id":102781,"date":"2018-11-17T15:12:19","date_gmt":"2018-11-17T14:12:19","guid":{"rendered":"https:\/\/www.electrive.com\/?p=102781"},"modified":"2023-11-02T08:51:57","modified_gmt":"2023-11-02T07:51:57","slug":"londres-recibe-36-autobuses-electricos-byd-adl","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2018\/11\/17\/london-receives-36-byd-adl-electric-buses\/","title":{"rendered":"Londres recibe 36 autobuses el\u00e9ctricos de BYD y ADL"},"content":{"rendered":"<p>El pedido ya se ha completado, con la entrega de los 36 autobuses de 10,8 millones y la instalaci\u00f3n de la infraestructura de recarga en el dep\u00f3sito de autobuses de los operadores en Shepard's Bush. La directora general de la RATP, Catherine Guillouard, declar\u00f3: \"Hemos estado esperando con impaciencia la mejora de este dep\u00f3sito, que demuestra de forma muy tangible nuestro compromiso con los viajes limpios y sostenibles\", antes de a\u00f1adir que la empresa aspiraba a electrificar toda su flota con el tiempo.<\/p>\n<p>BYD y ADL tambi\u00e9n cooperaron con SSL en el cableado de alimentaci\u00f3n, datos y cableado para la infraestructura de carga, que cuenta con un sistema de carga autom\u00e1tica para la carga nocturna.<\/p>\n<p>Tambi\u00e9n est\u00e1 en marcha otra cooperaci\u00f3n de BYD, ya que la empresa se ha asociado con la compa\u00f1\u00eda de log\u00edstica Aramex para entregar diez transportadores el\u00e9ctricos T3 en Amm\u00e1n, Jordania.<\/p>\n<p><a href=\"http:\/\/www.transportengineer.org.uk\/transport-engineer-news\/depot-transformed-into-smart-electric-facility-for-london-bus-operator\/195318\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">transportengineer.org<\/a>, <a href=\"http:\/\/www.bydeurope.com\/news\/news.php?action=readnews&amp;page=1&amp;nid=270\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">bydeurope.com<\/a>, <a href=\"https:\/\/www.intelligenttransport.com\/transport-news\/73546\/ratp-dev-electric-bus-depot\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">intelligenttransport.com<\/a>, <a href=\"http:\/\/www.china.org.cn\/business\/2018-11\/15\/content_72611425.htm\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">china.org.cn<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>El pedido ya se ha completado, con la entrega de los 36 autobuses de 10,8 m y la instalaci\u00f3n de la infraestructura de recarga en las cocheras de los operadores.<\/p>","protected":false},"author":22,"featured_media":102751,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9942],"tags":[4249,4582,16391,80,7242,10174,16316,10872,840,16392,2158],"class_list":["post-102781","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fleets","tag-alexander-dennis","tag-amman","tag-aramex","tag-byd","tag-byd-adl","tag-charging-stations","tag-enviro200ev","tag-jordan","tag-london","tag-ssl","tag-uk"],"acf":{"inhalt_teil2":"","post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9942],"post_tags":[80,840,2158,4582,7242,10174,10872,16316,16391,16392,4249],"post_thumbnail":102751,"post_thumbnail-caption":"","post_teaser-text":"The cooperation between the electric bus manufacturers BYD and ADL has completed it's order, as 36 electric buses were delivered to public transport operator RATP Dev in London. The Enviro200 EV electric buses, including infrastructure, were ordered in 2017.","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/102781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=102781"}],"version-history":[{"count":2,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/102781\/revisions"}],"predecessor-version":[{"id":214212,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/102781\/revisions\/214212"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/102751"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=102781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=102781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=102781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}