{"id":120723,"date":"2019-10-15T17:20:39","date_gmt":"2019-10-15T15:20:39","guid":{"rendered":"https:\/\/www.electrive.com\/?p=120723"},"modified":"2019-10-15T23:56:40","modified_gmt":"2019-10-15T21:56:40","slug":"bp-chargemaster-continua-el-despliegue-de-estaciones-de-recarga-en-el-reino-unido","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2019\/10\/15\/bp-chargemaster-continues-uk-charging-station-roll-out\/","title":{"rendered":"BP Chargemaster contin\u00faa con el despliegue de estaciones de recarga en el Reino Unido"},"content":{"rendered":"<p>BP Chargemaster instal\u00f3 cuatro nuevos cargadores r\u00e1pidos de 150 kW en su centro comercial de Hammersmith, Londres. Su plan es equipar su red de recarga Polar con otras 400 unidades de carga ultrarr\u00e1pida para 2021.<!--more--><\/p>\n<p>Los cargadores se pusieron en marcha esta semana, tras el despliegue en el Reino Unido de la red de recarga r\u00e1pida de Polar en todo el pa\u00eds. El primero de los <a href=\"https:\/\/www.electrive.com\/es\/2019\/08\/15\/bp-abre-cargadores-de-150-kw-en-estaciones-de-servicio-del-reino-unido\/\">Cargadores r\u00e1pidos de 150 kW<\/a> se pusieron en marcha en agosto, con las dos primeras unidades instaladas en el centro comercial BP Cranford de Hounslow. La carga puede realizarse tanto con conectores CHAdeMO como CCS, siendo posible una carga completa en unos 10-12 minutos de tiempo de carga para la mayor\u00eda de los VE.<\/p>\n<p><a href=\"https:\/\/www.electrive.com\/es\/2018\/06\/28\/bp-compra-la-red-britanica-de-recarga-polar\/\">BP compr\u00f3 Chargemaster<\/a> en 2018, incluida la red Polar. En aquel momento, la red contaba con 6.500 estaciones de recarga en el Reino Unido, que desde entonces se han visto complementadas con el despliegue de las estaciones de recarga ultrarr\u00e1pida.<\/p>\n<p><a href=\"https:\/\/bpchargemaster.com\/bp-chargemaster-installs-londons-first-150kw-ultra-fast-charging-hub\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">bpchargemaster.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>BP Chargemaster instal\u00f3 cuatro nuevos cargadores r\u00e1pidos de 150 kW en su centro comercial de Hammersmith, Londres. Su plan es equipar su red de recarga Polar con otros 400<\/p>","protected":false},"author":22,"featured_media":113437,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[8879,15268,3315,1042,10174,9221,840,10205,2158],"class_list":["post-120723","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-bp","tag-bp-chargemaster","tag-ccs","tag-chademo","tag-charging-stations","tag-hpc","tag-london","tag-polar-network","tag-uk"],"acf":{"inhalt_teil2":""},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/120723","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=120723"}],"version-history":[{"count":0,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/120723\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/113437"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=120723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=120723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=120723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}