{"id":132960,"date":"2020-05-13T18:43:07","date_gmt":"2020-05-13T16:43:07","guid":{"rendered":"https:\/\/www.electrive.com\/?p=132960"},"modified":"2020-05-14T09:04:38","modified_gmt":"2020-05-14T07:04:38","slug":"western-power-distribution-actualiza-su-estrategia-ev","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2020\/05\/13\/western-power-distribution-updates-ev-strategy\/","title":{"rendered":"Western Power Distribution actualiza su estrategia de VE"},"content":{"rendered":"<p>En el Reino Unido, Western Power Distribution (WPD) acaba de hacer p\u00fablicos los detalles de su estrategia actualizada para veh\u00edculos el\u00e9ctricos. Para permitir un despliegue m\u00e1s r\u00e1pido de los puntos de recarga en todo el Reino Unido, WPD se est\u00e1 centrando en facilitar el proceso de conexi\u00f3n a los operadores de puntos de recarga. <!--more--><\/p>\n<p>El operador de la red planea hacerlo ofreciendo a los operadores de puntos de recarga de VE contratos de arrendamiento consecutivos, cuando esto resulte apropiado. En general, la actualizaci\u00f3n de la estrategia de e-movilidad se basa en la experiencia de los servicios p\u00fablicos en ensayos como el <a href=\"https:\/\/www.electrive.com\/es\/etiqueta-2\/nacion-electrica\/\">Naci\u00f3n el\u00e9ctrica<\/a> estudiando la carga inteligente residencial ya en 2016 o el <a href=\"https:\/\/www.electrive.com\/es\/2019\/12\/04\/el-proyecto-dc-share-del-reino-unido-habilitara-centros-de-recarga-rapida\/\">Acci\u00f3n DC<\/a> ensayo. Con este \u00faltimo, pretenden una soluci\u00f3n novedosa para utilizar la capacidad latente en las redes de distribuci\u00f3n para alimentar de forma m\u00e1s uniforme los centros de recarga r\u00e1pida.<\/p>\n<p>El director de desarrollo de DSO de WPD, Paul Jewell, declar\u00f3: \"Nuestra estrategia actualizada detalla c\u00f3mo estamos haciendo que las conexiones de cargadores de VE en nuestra red sean m\u00e1s f\u00e1ciles y r\u00e1pidas. En los pr\u00f3ximos 12 meses, nuestros proyectos de innovaci\u00f3n previstos ver\u00e1n el despliegue de soluciones de carga l\u00edderes en la industria tanto para entornos dom\u00e9sticos como no dom\u00e9sticos.\"<\/p>\n<p>Esto incluye el desarrollo del proyecto Electric Nation - PowerUp durante 2020, en el que WPD supervisar\u00e1 unos 100 cargadores V2G.<\/p>\n<p>Para una mayor recarga residencial, WPD tambi\u00e9n ha actualizado su estrategia esbozando planes para desarrollar nuevas soluciones de recarga para los clientes dom\u00e9sticos. Esto implicar\u00e1 invertir en una serie de proyectos de mejora de la red para satisfacer la demanda de instalaciones de recarga dom\u00e9stica. Despu\u00e9s, para dejar espacio al crecimiento de la recarga en la v\u00eda p\u00fablica, WPD cambiar\u00e1 la forma en que suministra electricidad a las instalaciones existentes en las calles, como las farolas.<\/p>","protected":false},"excerpt":{"rendered":"<p>En el Reino Unido, Western Power Distribution (WPD) acaba de hacer p\u00fablicos los detalles de su estrategia actualizada para los veh\u00edculos el\u00e9ctricos. Con el fin de permitir un despliegue m\u00e1s r\u00e1pido de puntos de recarga<\/p>","protected":false},"author":24,"featured_media":128197,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[3701,10174,7548,19272,7074,6382,2158,19271],"class_list":["post-132960","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-bev","tag-charging-stations","tag-dc","tag-dc-share","tag-electric-nation","tag-phev","tag-uk","tag-western-power-distribution"],"acf":{"inhalt_teil2":"<p>On the non-domestic side of things, WPD is teaming up with motorway service operators to develop charging solutions at roadside fuel filling stations. During Phase 1 of the Department for Transport\u2019s Office for Low Emission Vehicles\u2019 Project Rapid, WPD helped to roll out rapid charging solutions at motorway service stations in the UK, providing the electrical capacity for 48 chargers to be installed across its network. As part of Phase 2, WPD is aiming for further EV charger installations. A trial project is planned in cooperation with Moto Services at one of their motorway service areas. The focus here utilising rapid charging with new technology that requires significantly less space than current chargers.<\/p>\n<p>Commenting on the release of the updated strategy, Jewell said: &#8220;Our estimates suggest that, in order to reach the charging capacity required to meet the decarbonisation of transport, the UK needs to install 2,700 charge points a day. Our EV strategy shows we have the solutions to make EV charging quick and effective for customers. We are working hard alongside industry, Government and stakeholders to ensure that everyone who wants an EV charger can get one.\u201d<\/p>\n<p>Scenarios that were worked through by WPD suggest that the number of electric cars in the UK could reach around 15 million units by 2032, rising to over 38 million by 2038. At the same time, current projections suggest that around 217,000 chargers will be connected to WPD\u2019s network by 2023.<\/p>\n<p><em>Additional reporting by Nora Manthey, UK.<\/em><\/p>\n<p><a href=\"https:\/\/www.current-news.co.uk\/news\/wpd-updates-ev-strategy-in-bid-to-rollout-industry-leading-charging-solutions\" target=\"_blank\" rel=\"noopener noreferrer\">current-news.co.uk<\/a>, and information via email.<\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/132960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=132960"}],"version-history":[{"count":0,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/132960\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/128197"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=132960"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=132960"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=132960"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}