{"id":137982,"date":"2020-08-17T14:06:53","date_gmt":"2020-08-17T12:06:53","guid":{"rendered":"https:\/\/www.electrive.com\/?p=137982"},"modified":"2024-02-29T11:27:00","modified_gmt":"2024-02-29T10:27:00","slug":"el-gobierno-aleman-financia-la-planta-de-northvolt-en-suecia","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2020\/08\/17\/german-government-funds-northvolt-plant-in-sweden\/","title":{"rendered":"El gobierno alem\u00e1n financia una planta de bater\u00edas de Northvolt en Suecia"},"content":{"rendered":"<p>El gobierno alem\u00e1n apoyar\u00e1 la financiaci\u00f3n de la f\u00e1brica de c\u00e9lulas de bater\u00edas de Northvolt en Suecia con una garant\u00eda estatal de 443 millones de euros como parte del programa federal de fomento del comercio exterior.<!--more--><\/p>\n<p>La ayuda se concedi\u00f3 teniendo en cuenta que los fabricantes de autom\u00f3viles de la industria automovil\u00edstica alemana colaboran con Northvolt. La f\u00e1brica de c\u00e9lulas de bater\u00edas se considera un elemento importante en la creaci\u00f3n de una cadena de valor amplia y estable para los veh\u00edculos el\u00e9ctricos en Alemania y Europa.<\/p>\n<p>Desde Alemania, los gigantes automovil\u00edsticos Volkswagen y BMW se han comprometido a cooperar estrat\u00e9gicamente con Northvolt para llevar a cabo actividades conjuntas de investigaci\u00f3n y desarrollo en la planta sueca. La cooperaci\u00f3n tambi\u00e9n permitir\u00e1 a las dos empresas asegurarse el suministro de c\u00e9lulas de bater\u00edas a largo plazo.<\/p>\n<p>BMW firm\u00f3 un contrato de suministro con Northvolt <a href=\"https:\/\/www.electrive.com\/es\/2020\/07\/16\/northvolt-se-convierte-en-el-tercer-proveedor-de-celulas-de-bateria-de-bmw\/\">en julio<\/a>complementando los contratos existentes con Samsung SDI y CATL. A partir de 2024, la empresa sueca deber\u00e1 suministrar al constructor alem\u00e1n c\u00e9lulas por valor de 2.000 millones de euros.<\/p>","protected":false},"excerpt":{"rendered":"<p>El Gobierno alem\u00e1n apoyar\u00e1 la financiaci\u00f3n de la f\u00e1brica de pilas de bater\u00eda de Northvolt en Suecia con una garant\u00eda estatal de 443 millones de euros como parte del programa federal<\/p>","protected":false},"author":24,"featured_media":93062,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9927],"tags":[10230,13682,10914,4587,10040,8043,9467,10032,13946,10141],"class_list":["post-137982","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-fuel-cell","tag-batteries","tag-battery-cells","tag-battery-production","tag-bmwi","tag-europe","tag-northvolt","tag-skelleftea","tag-subsidies","tag-suppliers","tag-sweden"],"acf":{"inhalt_teil2":"<p>The Northvolt production plant in Sweden also serves as a reference and pilot project for the Northvolt Zwei (German for two) <a href=\"https:\/\/www.electrive.com\/2020\/05\/09\/volkswagen-builds-battery-factory-in-salzgitter\/\">production facility Salzgitter in Germany<\/a>. The German plant is a joint venture between Northvolt and Volkswagen and will begin operation from 2024. The Volkswagen-Northvolt plant was announced back in June 2019, when both companies said that the battery cell production at the plant would be set up from 2020 and start at the turn of the year 2023\/24. The target for the first year is a capacity of 16 GWh, after which Volkswagen and Northvolt are aiming to expand this to 24 GWh.<\/p>\n<p>The guarantee from the German Federal Government is granted under the government&#8217;s foreign trade and investment promotion scheme. These are called UFK guarantees and can be used to support projects abroad in which there is a special government interest \u2013 in this case because of their importance for the German automotive and electromobility sector. As part of the overall financing, the UFK guarantee covers a loan of 525 million dollars granted by banks against the default of political and economic risks up to an amount of 80 per cent.<\/p>\n<p>In addition to the financing from Germany, funds gathered so far have also come from France, Japan, Korea and the European Investment Bank. <a href=\"https:\/\/www.electrive.com\/2020\/07\/29\/northvolt-secures-credit-for-over-1-6-billion-dollars\/\">Just last month Northvolt took out further loans<\/a> totalling 1.6 billion dollars from a number of banks to finance upcoming battery cell factories. In total, Northvolt has thus secured over 3 billion US dollars.<\/p>\n<p>The annual production capacity of the Swedish battery cell plant is to start in 2021 with 32 GWh capacity and fully expanded in 2024 with 40 GWh.<\/p>\n<p><a href=\"https:\/\/www.bmwi.de\/Redaktion\/DE\/Pressemitteilungen\/2020\/20200817-bundeswirtschaftsministerium-unterstuetzt-finanzierung-einer-batteriezellenfabrik-in-schweden-mit-staatlicher-garantie.html\" target=\"_blank\" rel=\"noopener noreferrer\">bmwi.de<\/a> (in German)<\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/137982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=137982"}],"version-history":[{"count":1,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/137982\/revisions"}],"predecessor-version":[{"id":229939,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/137982\/revisions\/229939"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/93062"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=137982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=137982"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=137982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}