{"id":147552,"date":"2021-01-21T14:41:44","date_gmt":"2021-01-21T13:41:44","guid":{"rendered":"https:\/\/www.electrive.com\/?p=147552"},"modified":"2024-02-29T11:26:17","modified_gmt":"2024-02-29T10:26:17","slug":"tesla-obtiene-luz-verde-para-la-preparacion-de-una-planta-de-baterias-en-giga-berlin","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2021\/01\/21\/tesla-gets-green-light-for-battery-plant-preparation-at-giga-berlin\/","title":{"rendered":"Tesla obtiene luz verde para preparar una planta de bater\u00edas en Giga Berl\u00edn"},"content":{"rendered":"<p>Tesla puede iniciar los preparativos para su f\u00e1brica de bater\u00edas en el emplazamiento de Giga Berlin, en Gr\u00fcnheide, antes de lo previsto. Seg\u00fan un portavoz de BMWi, se ha concedido a Tesla un inicio provisional de las obras previa solicitud, aunque esto no es en s\u00ed mismo un permiso de construcci\u00f3n.<!--more--><\/p>\n<p>Aunque ya pueden empezar los preparativos en Gr\u00fcnheide para la planta de bater\u00edas de Tesla, a\u00fan no se ha perdido la oportunidad de obtener financiaci\u00f3n federal alemana. El Ministerio Federal de Econom\u00eda y Tecnolog\u00eda alem\u00e1n (BMWi) present\u00f3 en diciembre a la Comisi\u00f3n de la UE el segundo gran proyecto europeo para la producci\u00f3n de c\u00e9lulas de bater\u00edas. Las subvenciones que contiene a\u00fan no han sido examinadas ni aprobadas con arreglo a la ley de ayudas estatales.<\/p>\n<p>Seg\u00fan <em>Teslerati<\/em>, la instalaci\u00f3n de 4680 celdas de Giga Berl\u00edn se convertir\u00e1 en una de las mayores f\u00e1bricas de bater\u00edas del mundo cuando est\u00e9 terminada. Elon Musk afirma que la planta tendr\u00e1 una producci\u00f3n de 100 GWh al a\u00f1o. El sitio web escribe que Musk dijo adem\u00e1s que la planta de bater\u00edas 4680 de Giga Berl\u00edn podr\u00eda ampliarse a 200 o 250 GWh al a\u00f1o cuando est\u00e9 totalmente en marcha.<\/p>\n<p>Como es habitual, la financiaci\u00f3n s\u00f3lo estar\u00e1 disponible si el proyecto no hubiera podido ejecutarse sin financiaci\u00f3n, lo que significa que la construcci\u00f3n real no puede comenzar de antemano. Sin embargo, las \"medidas preparatorias\" no excluir\u00e1n la posibilidad de financiaci\u00f3n.<\/p>","protected":false},"excerpt":{"rendered":"<p>Tesla puede iniciar los preparativos de su f\u00e1brica de bater\u00edas en el emplazamiento de Giga Berlin, en Gr\u00fcnheide, antes de lo previsto. Se ha concedido a Tesla un inicio provisional para la<\/p>","protected":false},"author":24,"featured_media":147202,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9927],"tags":[10230,13682,10914,4587,14746,960,9961,20515,3203,19081,10032,509],"class_list":["post-147552","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-fuel-cell","tag-batteries","tag-battery-cells","tag-battery-production","tag-bmwi","tag-brandenburg","tag-eu","tag-germany","tag-giga-berlin","tag-gigafactory","tag-gigafactory-4","tag-subsidies","tag-tesla"],"acf":{"inhalt_teil2":"<p>After several misleading reports by the German boulevard newspapers <em>BZ<\/em> and <em>Bild<\/em> (translated headlines: &#8220;Tesla battery factory is approved ahead of schedule&#8221;), upon the request of the German website <em>Teslamag<\/em>, the German Federal Ministry BMWI clarified that there is no building permit and that the Ministry of Economics is not responsible for that. The correct information is that Tesla and other companies have applied for permission to prepare their projects within the EU funding framework for cell production, even though the approval under state aid law has not yet been granted. Tesla and other companies have been &#8220;allowed a provisional start of action&#8221; on its request to build the battery factory, according to a spokesperson for the Ministry of Economic Affairs, &#8220;meaning that companies are allowed to start preparatory work on their projects at their own risk.&#8221;<\/p>\n<p>On Wednesday, Brandenburg&#8217;s Minister of Economics, J\u00f6rg Steinbach indicated in the state parliament that an application for cell production was not yet available. So far, the applications are probably mainly about the car plant, not the later-announced battery production.<\/p>\n<p>Only at the <a href=\"https:\/\/www.electrive.com\/2021\/01\/18\/tesla-model-y-deliveries-officially-launch-in-china\/\">beginning of this week<\/a>, it was made public that Tesla had submitted a building application to the building authority of the local Oder-Spree district for another large hall on the same 300-hectare site in Gr\u00fcnheide. The building is to be used for other purposes on a transitional basis. Still, it will then house battery cell production for the Teslas manufactured next door, according to the\u00a0 German newspaper <em>Tagesspiegel<\/em>. A spokesperson for the district office confirmed to the newspaper that the application for a warehouse was received shortly before Christmas. Still, there is not yet an application for a battery factory.<\/p>\n<p><a href=\"https:\/\/www.teslarati.com\/tesla-4680-battery-factory-worlds-largest-giga-berlin-approved\/\" target=\"_blank\" rel=\"noopener\">teslarati.com<\/a>, <a href=\"https:\/\/teslamag.de\/news\/tesla-batteriefabrik-gruenheide-kommt-berichte-vorab-erlaubnis-irrefuehrend-33233\" target=\"_blank\" rel=\"noopener\">teslamag.de<\/a> (in German)<\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/147552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=147552"}],"version-history":[{"count":1,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/147552\/revisions"}],"predecessor-version":[{"id":229929,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/147552\/revisions\/229929"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/147202"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=147552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=147552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=147552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}