{"id":190964,"date":"2023-03-10T12:32:02","date_gmt":"2023-03-10T11:32:02","guid":{"rendered":"https:\/\/www.electrive.com\/?p=190964"},"modified":"2023-03-10T14:00:33","modified_gmt":"2023-03-10T13:00:33","slug":"mercedes-construira-sus-primeros-cargadores-rapidos-antes-de-2023","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/03\/10\/mercedes-to-build-first-own-fast-chargers-before-2023\/","title":{"rendered":"Mercedes construir\u00e1 sus primeros cargadores r\u00e1pidos antes de 2023"},"content":{"rendered":"<p>Despu\u00e9s de que Mercedes-Benz anunciara a principios de este a\u00f1o planes de gran alcance para construir su propia red mundial de HPC en Norteam\u00e9rica, Europa y China, la empresa da ahora m\u00e1s detalles. El desarrollo comenzar\u00e1 en el cuarto trimestre de 2023 en EE.UU. y en los pa\u00edses europeos de Alemania y Francia.<!--more--><\/p>\n<p>As\u00ed lo declar\u00f3 Franz Reiner, director general de Mercedes-Benz Mobility, al <em>Deutsche Presse-Agentur<\/em> (DPA). En EE UU, los primeros 20 parques de recarga, cada uno con varios puntos de recarga, est\u00e1n previstos para este a\u00f1o. Reiner no dio una cifra exacta para Europa. En el informe de la DPA no se indica si este a\u00f1o se construir\u00e1n m\u00e1s o menos parques de recarga en Europa que en EE UU.<\/p>\n<p>Mercedes anunci\u00f3 que construir\u00eda su propia red HPC con m\u00e1s de 10.000 puntos de recarga en el CES de <a href=\"https:\/\/www.electrive.com\/es\/2023\/01\/06\/mercedes-benz-lanza-la-red-hpc-de-marca\/\">Enero de 2023<\/a>. Las estaciones ofrecer\u00e1n hasta 350 kW de potencia de carga cada una y ser\u00e1n de acceso p\u00fablico. Sin embargo, los clientes de Mercedes tendr\u00e1n acceso preferente, por ejemplo, pudiendo reservar puntos de recarga.<\/p>\n<p>Del total de m\u00e1s de 10.000 puntos de recarga HPC para finales de esta d\u00e9cada, m\u00e1s de 2.000 se construir\u00e1n en EE.UU. y Europa, respectivamente, y el resto en China y \"otros mercados importantes\". Seg\u00fan Reiner, Mercedes est\u00e1 invirtiendo para ello \"una cantidad baja de un solo d\u00edgito de miles de millones de euros\".<\/p>","protected":false},"excerpt":{"rendered":"<p>Despu\u00e9s de que Mercedes-Benz anunciara a principios de este a\u00f1o planes de gran alcance para construir su propia red global de HPC en Norteam\u00e9rica, Europa y China, la empresa est\u00e1 ahora<\/p>","protected":false},"author":22,"featured_media":190930,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[9956,1209,10174,98,7548,10040,9970,9961,9221,362,27149,12102,609],"class_list":["post-190964","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-canada","tag-chargepoint","tag-charging-stations","tag-china","tag-dc","tag-europe","tag-france","tag-germany","tag-hpc","tag-mercedes-benz","tag-mn8-energy","tag-north-america","tag-usa"],"acf":{"inhalt_teil2":"<p>However, Mercedes only sees its own fast-charging parks as a supplement to the overall infrastructure, so the network is unlikely to become so dense that long-distance travel is only (conveniently) possible with Mercedes charging stations. &#8220;The charging infrastructure still has some potential,&#8221; Reiner told DPA. &#8220;We will definitely not be able to cover everything with our fast charging stations.&#8221;<\/p>\n<p>It is already certain that Mercedes will work with MN8 Energy and ChargePoint to build the US charging parks. By 2027, a network of more than 400 locations in total with more than 2,500 HPC chargers is to be created in the US and Canada. Mercedes and MN8 will share the costs. Mercedes manager Reiner did not name a partner for Europe or China in the DPA interview.<\/p>\n<p><a href=\"https:\/\/www.handelsblatt.com\/dpa\/elektromobilitaet-mercedes-beginnt-2023-mit-bau-vone-ladesaeulen\/29029294.html\" target=\"_blank\" rel=\"noopener\">handelsblatt.com<\/a> (in German)<\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/190964","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=190964"}],"version-history":[{"count":0,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/190964\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/190930"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=190964"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=190964"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=190964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}