{"id":192312,"date":"2023-03-23T12:16:53","date_gmt":"2023-03-23T11:16:53","guid":{"rendered":"https:\/\/www.electrive.com\/?p=192312"},"modified":"2023-03-23T17:04:42","modified_gmt":"2023-03-23T16:04:42","slug":"el-bordillo-conectado-lanza-una-gran-iniciativa-de-recarga-en-surrey","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/03\/23\/connected-kerb-launches-huge-charging-initiative-in-surrey\/","title":{"rendered":"Connected Kerb lanza una gran iniciativa de recarga en Surrey"},"content":{"rendered":"<p>El Consejo del Condado de Surrey y el proveedor de puntos de recarga para veh\u00edculos el\u00e9ctricos Connected Kerb se al\u00edan para realizar el mayor despliegue de cargadores de veh\u00edculos el\u00e9ctricos por parte de una autoridad local en el Reino Unido. Se instalar\u00e1n unos 10.000 nuevos cargadores p\u00fablicos en todo el condado de aqu\u00ed a 2030. <!--more--><\/p>\n<p>Connected Kerb instalar\u00e1 sus puntos de recarga en m\u00e1s de 1.500 puntos repartidos por calles y aparcamientos p\u00fablicos de Surrey. Los socios esperan entregar m\u00e1s de 5.000 puntos de recarga r\u00e1pida para 2027, incluyendo m\u00e1s de 500 en todo el condado.<\/p>\n<p>En Surrey hay un cargador por cada 9.000 habitantes, pero el nuevo plan har\u00e1 que esta cifra \"aumente dr\u00e1sticamente\", escribe Connected. La empresa ya ha trabajado anteriormente con el Consejo del Condado de Surrey.<\/p>\n<p>\"En los dos \u00faltimos a\u00f1os, hemos instalado m\u00e1s de 100 puntos de recarga para veh\u00edculos el\u00e9ctricos en Surrey, lo que nos ha dado la oportunidad de probar diferentes proveedores y procesos\", declar\u00f3 Matt Furniss, miembro del Gabinete de Transporte, Infraestructuras y Crecimiento del Consejo del Condado de Surrey. \"Tenemos una relaci\u00f3n consolidada con Connected Kerb, y este contrato nos permitir\u00e1 ampliar nuestra red de puntos de carga y acelerar el proceso de instalaci\u00f3n para ofrecer servicios a nuestros residentes con mayor rapidez.\"<\/p>\n<p>El contrato liberar\u00e1 hasta 60 millones de libras en inversiones de Connected Kerb. Por tanto, la empresa financiar\u00e1 la mayor parte del proyecto. Otras opciones de financiaci\u00f3n, como las subvenciones del gobierno central, tambi\u00e9n est\u00e1n disponibles para hacer viables este tipo de proyectos, seg\u00fan el comunicado.<\/p>","protected":false},"excerpt":{"rendered":"<p>El Consejo del Condado de Surrey y el proveedor de puntos de recarga para veh\u00edculos el\u00e9ctricos Connected Kerb se unen para realizar el mayor despliegue de cargadores para veh\u00edculos el\u00e9ctricos por parte de una autoridad local en el Reino Unido.<\/p>","protected":false},"author":21,"featured_media":192328,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[5755,10174,16898,1742,14170,2158],"class_list":["post-192312","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-ac","tag-charging-stations","tag-connected-kerb","tag-england","tag-surrey","tag-uk"],"acf":{"inhalt_teil2":"<p>This investment follows <a href=\"https:\/\/www.electrive.com\/2022\/09\/26\/aviva-invests-110-million-in-connected-kerb\/\">a \u00a3110 million investment<\/a> from Aviva Investors in Connected Kerb to deliver 190,000 charge points before 2030. The company writes this was 63% of the UK government&#8217;s 300,000 chargepoint estimates. The company also likened the \u00a3110 million to around a quarter of all the funding provided by the UK government under the Local Electric Vehicle Infrastructure (LEVI) fund, designed to help local authorities fund on-street electric vehicle charging projects.<\/p>\n<p>&#8220;The recent Net Zero Review was clear, said Chris Pateman-Jones, CEO of Connected Kerb. &#8220;If one local authority can deliver such a significant boost to the UK&#8217;s charging network, just imagine what we could achieve by 2030 if every city, county, and combined authority was empowered to do the same.&#8221;<\/p>\n<p>The rollout in Surrey will consist of Connected Kerb&#8217;s entire product range, including 7kW and 22kW Gecko chargers, Chameleon chargers for on-street and car parks, the wall-mounted Limpet and the Scarab throughout housing developments.<\/p>\n<p><a href=\"https:\/\/www.electrive.com\/tag\/connected-kerb\/\">Connected Kerb<\/a> first released plans to install 190,000 EV chargers across the UK in late 2021.<\/p>\n<p><a href=\"https:\/\/www.connectedkerb.com\/stories\/connected-kerb-surrey-county-council-take-the-lead-on-delivering-ambition-of-10000-public-ev-charging-points-by-2030\" target=\"_blank\" rel=\"noopener\">connectedkerb.com<\/a><\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/192312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=192312"}],"version-history":[{"count":0,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/192312\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/192328"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=192312"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=192312"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=192312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}