{"id":192465,"date":"2023-03-24T11:51:08","date_gmt":"2023-03-24T10:51:08","guid":{"rendered":"https:\/\/www.electrive.com\/?p=192465"},"modified":"2024-02-29T11:24:15","modified_gmt":"2024-02-29T10:24:15","slug":"la-fabrica-de-baterias-de-lges-en-arizona-sera-mayor-de-lo-previsto","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/03\/24\/lges-arizona-battery-factory-will-be-larger-than-planned\/","title":{"rendered":"La f\u00e1brica de bater\u00edas de LGES en Arizona ser\u00e1 mayor de lo previsto"},"content":{"rendered":"<p>La f\u00e1brica de bater\u00edas que LG Energy Solution (LGES) proyecta en Arizona ser\u00e1 significativamente mayor de lo que se hab\u00eda comunicado anteriormente. La capacidad para pilas redondas es ahora mayor, y tambi\u00e9n se construir\u00e1 en el emplazamiento una instalaci\u00f3n adicional de producci\u00f3n de pilas de bolsa con qu\u00edmica celular LFP.<!--more--><\/p>\n<p>El a\u00f1o pasado, LGES anunci\u00f3 que estaba construyendo un <a href=\"https:\/\/www.electrive.com\/es\/2022\/03\/25\/lges-construira-una-planta-de-baterias-en-arizona\/\" target=\"_blank\" rel=\"noopener\">planta de producci\u00f3n<\/a> de pilas cil\u00edndricas para veh\u00edculos el\u00e9ctricos en Queen Creek, en el estado norteamericano de Arizona. Se dec\u00eda que la capacidad anual era de 11 GWh. Ahora la empresa afirma que ser\u00e1 m\u00e1s del doble, alcanzando una capacidad anual de 27 GWh.<\/p>\n<p>LGES tambi\u00e9n planea una segunda planta de producci\u00f3n en el emplazamiento para c\u00e9lulas de bolsa LFP destinadas a sistemas estacionarios de almacenamiento de energ\u00eda con una capacidad anual de 16 GWh. LG Energy Solution invertir\u00e1 unos 7,2 billones de wones (unos $5.500 millones ) en la construcci\u00f3n del complejo de fabricaci\u00f3n de bater\u00edas de Queen Creek, m\u00e1s de cuatro veces la cantidad inicialmente destinada al proyecto. Se trata de la \"mayor inversi\u00f3n jam\u00e1s realizada para una instalaci\u00f3n independiente de fabricaci\u00f3n de bater\u00edas en Norteam\u00e9rica\", afirma LG. Algo m\u00e1s de $3.000 millones se destinar\u00e1n a la producci\u00f3n de c\u00e9lulas redondas.<\/p>\n<p>Las razones del cambio de planes son, por un lado, \"la creciente demanda por parte de los fabricantes de VE de bater\u00edas de alto rendimiento y alta calidad fabricadas localmente en un esfuerzo por satisfacer los cr\u00e9ditos fiscales para VE de la Ley de Reducci\u00f3n de la Inflaci\u00f3n (IRA)\". Por otro lado, la empresa afirma que tambi\u00e9n est\u00e1 aumentando la demanda de bater\u00edas para el almacenamiento estacionario de energ\u00eda.<\/p>","protected":false},"excerpt":{"rendered":"<p>La f\u00e1brica de bater\u00edas que LG Energy Solution (LGES) proyecta en Arizona ser\u00e1 significativamente mayor de lo que se hab\u00eda comunicado anteriormente. La capacidad de c\u00e9lulas redondas es ahora mayor,<\/p>","protected":false},"author":29,"featured_media":172205,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9927],"tags":[3572,10230,13682,10914,21975,25401,13946,609],"class_list":["post-192465","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-fuel-cell","tag-arizona","tag-batteries","tag-battery-cells","tag-battery-production","tag-lg-energy-solution","tag-queen-creek","tag-suppliers","tag-usa"],"acf":{"inhalt_teil2":"<p>But the change in plans is causing a delay. Construction was initially to kick off in Q2 of 2022, and the production start was scheduled for the second half of 2024.<\/p>\n<p>LGES now says that construction of both production facilities will begin this year. The round battery plant is scheduled to begin mass production 2170 format cells in 2025, primarily for EV makers in North America. Production of LFP cells is expected to start a year later.<\/p>\n<p>&#8220;Our decision to invest in Arizona demonstrates our strategic initiative to continue expanding our global production network, which is already the largest in the world, to further advance our innovative and top-quality products in scale and with speed,&#8221; says Youngsoo Kwon, CEO of LG Energy Solution. &#8220;We believe it&#8217;s the right move at the right time in order to empower clean energy transition in the US.&#8221;<br \/>\n<a href=\"https:\/\/www.lgcorp.com\/media\/release\/26057\" target=\"_blank\" rel=\"noopener\">lgcorp.com<\/a><\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/192465","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=192465"}],"version-history":[{"count":1,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/192465\/revisions"}],"predecessor-version":[{"id":229860,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/192465\/revisions\/229860"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/172205"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=192465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=192465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=192465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}