{"id":195055,"date":"2023-04-25T12:31:05","date_gmt":"2023-04-25T10:31:05","guid":{"rendered":"https:\/\/www.electrive.com\/?p=195055"},"modified":"2024-02-29T11:24:14","modified_gmt":"2024-02-29T10:24:14","slug":"hungria-la-nueva-planta-de-baterias-de-ecopro-bm-cumple-sus-objetivos","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/04\/25\/hungary-new-battery-plant-by-ecopro-bm-is-on-target\/","title":{"rendered":"Hungr\u00eda: La nueva planta de bater\u00edas de EcoPro BM cumple los objetivos"},"content":{"rendered":"<p>El fabricante surcoreano de materiales para bater\u00edas EcoPro BM ha iniciado la construcci\u00f3n de su f\u00e1brica en Debrecen, Hungr\u00eda. La planta producir\u00e1 anualmente 108.000 toneladas de materiales cat\u00f3dicos para bater\u00edas de coches el\u00e9ctricos y dar\u00e1 empleo a 631 personas.<!--more--><\/p>\n<p>As\u00ed lo anunci\u00f3 la agencia h\u00fangara de promoci\u00f3n de las inversiones HIPA en la ceremonia de colocaci\u00f3n de la primera piedra. Se trataba de demostrar \"que el proyecto de 728 millones de euros de la empresa surcoreana va seg\u00fan lo previsto\". EcoPro BM anunci\u00f3 el calendario en diciembre de 2021 y sigue cumpliendo los objetivos: la primera fase de construcci\u00f3n est\u00e1 prevista que finalice en la segunda mitad de 2024, y la segunda un a\u00f1o despu\u00e9s.<\/p>\n<p>EcoPro BM suministrar\u00e1 los materiales del c\u00e1todo a \u00a0<a href=\"https:\/\/www.electrive.com\/es\/2021\/02\/24\/samsung-sdi-amplia-la-produccion-de-baterias-en-hungria\/\">La f\u00e1brica de bater\u00edas de Samsung SDI<\/a> en G\u00f6d, Hungr\u00eda, cerca de Budapest. Las 108.000 toneladas de material cat\u00f3dico producir\u00e1n bater\u00edas para 1,35 millones de coches el\u00e9ctricos. Samsung SDI y EcoPro BM crearon una <a href=\"https:\/\/www.electrive.com\/es\/2020\/06\/03\/samsung-sdi-ecopro-bm-form-jv\/\">empresa conjunta de materiales cat\u00f3dicos<\/a> en 2020.<\/p>\n<p>Corea del Sur fue el pa\u00eds que m\u00e1s inversi\u00f3n extranjera directa (IED) aport\u00f3 a Hungr\u00eda entre 2019 y 2022, informa la HIPA. En los nueve a\u00f1os comprendidos entre 2014 y 2022 se cerraron un total de 49 acuerdos relacionados con la HIPA con empresas coreanas, la mayor\u00eda de ellos relacionados con la e-movilidad, por lo que la HIPA.<\/p>","protected":false},"excerpt":{"rendered":"<p>El fabricante surcoreano de materiales para bater\u00edas EcoPro BM ha iniciado la construcci\u00f3n de su f\u00e1brica en Debrecen, Hungr\u00eda. La planta producir\u00e1 108.000 toneladas de materiales de c\u00e1todo para pilas el\u00e9ctricas<\/p>","protected":false},"author":21,"featured_media":195032,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9927],"tags":[10230,10914,15586,6992,10210,13946],"class_list":["post-195055","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-fuel-cell","tag-batteries","tag-battery-production","tag-debrecen","tag-ecopro","tag-hungary","tag-suppliers"],"acf":{"inhalt_teil2":"<p>The EcoPro project is also not the only one related to electric vehicles. BMW is <a href=\"https:\/\/www.electrive.com\/2022\/06\/02\/bmw-lays-foundation-for-factory-in-hungary\/\">busy building<\/a> a new electric car plant in Debrecen and targets producing the first all-electric New Class vehicle there in 2025 and a high-voltage battery assembly plant, as <a href=\"https:\/\/www.electrive.com\/2022\/11\/26\/bmw-to-build-high-voltage-battery-assembly-in-debrecen\/\">reported<\/a>. In addition, CATL <a href=\"https:\/\/www.electrive.com\/2022\/08\/12\/catl-to-build-battery-factory-in-hungary-with-mercedes-as-major-customer\/\">reportedly<\/a> wants to build a battery cell factory in Debrecen, with an annual capacity of 100 GWh, among other things, to supply Mercedes-Benz.<\/p>\n<p>HIPA expects the new plants to &#8220;significantly contribute to the development of the local EV ecosystem&#8221;.<\/p>\n<p><a href=\"https:\/\/hipa.hu\/news\/construction-of-ecopro-bm-s-cathod-material-plant-on-schedule\/\" target=\"_blank\" rel=\"noopener\">hipa.hu<\/a><\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/195055","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=195055"}],"version-history":[{"count":1,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/195055\/revisions"}],"predecessor-version":[{"id":229854,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/195055\/revisions\/229854"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/195032"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=195055"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=195055"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=195055"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}