{"id":196244,"date":"2023-05-09T11:24:22","date_gmt":"2023-05-09T09:24:22","guid":{"rendered":"https:\/\/www.electrive.com\/?p=196244"},"modified":"2024-02-29T11:23:40","modified_gmt":"2024-02-29T10:23:40","slug":"northvolt-quiere-construir-una-planta-de-baterias-en-quebec","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/05\/09\/northvolt-wants-to-build-battery-plant-in-quebec\/","title":{"rendered":"Northvolt quiere construir una planta de bater\u00edas en Quebec"},"content":{"rendered":"<p>El fabricante sueco de pilas Northvolt y su filial Cuberg est\u00e1n planeando una f\u00e1brica en Canad\u00e1, seg\u00fan un informe de los medios de comunicaci\u00f3n. A\u00fan no se conocen muchos detalles, pero al parecer las empresas ya han preseleccionado dos ubicaciones concretas.<!--more--><\/p>\n<p>Como <em>Autonom\u00eda el\u00e9ctrica Canad\u00e1<\/em> informa con referencia a los documentos de los grupos de presi\u00f3n, se habla de Saint-Basile-Le-Grand y McMasterville, en Quebec, como ubicaciones preferentes. No hay m\u00e1s informaci\u00f3n sobre la capacidad de producci\u00f3n prevista ni sobre el calendario.<\/p>\n<p>Es posible que Northvolt d\u00e9 preferencia a un centro de producci\u00f3n en Norteam\u00e9rica sobre la f\u00e1brica de Alemania debido a las subvenciones disponibles all\u00ed. \"La f\u00e1brica de Heide podr\u00eda retrasarse\", hab\u00eda advertido el director general de Northvolt, Peter Carlsson, en <a href=\"https:\/\/www.electrive.com\/es\/2022\/10\/31\/los-precios-de-la-energia-pueden-retrasar-la-construccion-de-northvolt-drei\/\">Octubre de 2022<\/a>. \"Con los precios actuales de la electricidad, vemos peligrar la viabilidad econ\u00f3mica de los proyectos de alto consumo energ\u00e9tico en Alemania\". Y a\u00f1adi\u00f3: \"Queremos seguir siendo campeones europeos y l\u00edderes del mercado. Pero ahora estamos en un punto en el que quiz\u00e1 prioricemos la expansi\u00f3n en EE.UU. sobre Europa por el momento.\"<\/p>\n<p>Nicolas Steinbacher, Director de Estrategia y Programa de Northvolt Alemania, hizo comentarios similares en nuestro <a href=\"https:\/\/www.electrive.net\/2023\/03\/31\/batterie-europa-im-zangengriff-des-inflation-reduction-act\/\" rel=\"nofollow noopener\" target=\"_blank\">Conferencia en l\u00ednea en alem\u00e1n<\/a> <em>electrive.net EN VIVO<\/em> a finales de marzo. Steinbacher s\u00ed mencion\u00f3 las \"buenas conversaciones\" con los pol\u00edticos en torno a la planta de Heide. \"Las energ\u00edas renovables est\u00e1n directamente relacionadas con la producci\u00f3n sostenible de bater\u00edas. La ubicaci\u00f3n de una Gigafactor\u00eda se basa en la disponibilidad de energ\u00edas renovables\", dijo Steinbacher, un razonamiento que Northvolt utiliz\u00f3 en su d\u00eda para elegir el emplazamiento alem\u00e1n de Heide. \"Necesitamos conseguir un precio de la electricidad industrial en Europa para poder producir a precios competitivos aqu\u00ed en Alemania. Si perdemos la oportunidad ahora, los flujos de dinero se desviar\u00e1n... lejos de Europa\".<\/p>\n<p>En estos momentos, Northvolt est\u00e1 buscando en Canad\u00e1 un emplazamiento para una f\u00e1brica norteamericana. \"Northvolt est\u00e1 explorando la oportunidad de construir y explotar la producci\u00f3n de bater\u00edas en Norteam\u00e9rica (dise\u00f1o, desarrollo y producci\u00f3n de bater\u00edas), por lo que est\u00e1 dialogando con el Gobierno federal\", cita el informe de la entrada en el registro federal canadiense de grupos de presi\u00f3n. <em>Autonom\u00eda el\u00e9ctrica Canad\u00e1<\/em> escribe que ha comprobado los registros de grupos de presi\u00f3n de todas las provincias canadienses y s\u00f3lo ha encontrado v\u00ednculos con Northvolt en Quebec. En Canad\u00e1, todos los esfuerzos de los grupos de presi\u00f3n -incluso las conversaciones preliminares iniciales sobre la construcci\u00f3n de una f\u00e1brica, incluidos los posibles paquetes de subvenciones- deben registrarse. Por ejemplo, el director general de VW, Oliver Blume, tambi\u00e9n est\u00e1 registrado como grupo de presi\u00f3n en Canad\u00e1.<\/p>","protected":false},"excerpt":{"rendered":"<p>El fabricante sueco de pilas Northvolt y su filial Cuberg est\u00e1n proyectando una f\u00e1brica en Canad\u00e1, seg\u00fan un informe de los medios de comunicaci\u00f3n. A\u00fan no se conocen muchos detalles,<\/p>","protected":false},"author":22,"featured_media":173357,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9927],"tags":[10230,10914,9956,13524,28055,12102,8043,2294,28056,13946],"class_list":["post-196244","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-fuel-cell","tag-batteries","tag-battery-production","tag-canada","tag-cuberg","tag-mcmasterville","tag-north-america","tag-northvolt","tag-quebec","tag-saint-basile-le-grand","tag-suppliers"],"acf":{"inhalt_teil2":"<p>The two locations mentioned in the article are about a 30-minute drive east of Montreal. According to Electric Autonomy Canada, there are no EV supply chain companies in this region yet. There is already a battery centre of sorts in the province of Quebec: In the B\u00e9cancour Industrial Park, about two hours northeast of Montreal, both <a href=\"https:\/\/www.electrive.com\/2022\/11\/18\/general-motors-to-source-nickel-from-vale\/\">GM<\/a> and <a href=\"https:\/\/www.electrive.com\/2022\/07\/02\/britishvolt-posco-chemical-join-forces-on-batteries\/\">Posco<\/a> are building a cathode material factory, <a href=\"https:\/\/www.electrive.com\/2022\/06\/02\/basf-and-nano-one-co-develop-cathode-materials\/\">as is BASF<\/a>. The Canadian graphite producer Nouveau Monde Graphite (NMG) processes graphite grown in B\u00e9cancour in Qu\u00e9bec into anode material suitable for batteries. And mining group Vale is planning nickel processing in B\u00e9cancour. Vale Canada is also another Northvolt connection: <a href=\"https:\/\/www.electrive.com\/2022\/03\/28\/northvolt-places-nickel-order-with-vale-canada\/\">Last year<\/a>, Northvolt signed a multi-year agreement with the mining company to supply nickel products.<\/p>\n<p>Northvolt has not yet responded to a request for comment from the portal, but the office of Canada&#8217;s industry minister has &#8211; albeit only with a general statement. &#8220;Minister Champagne has worked tirelessly to secure the future of Canada\u2019s auto industry, including bringing more companies to Canada and the entire electric vehicle ecosystem,&#8221; a ministry spokesperson said. &#8220;It is good to see that our government\u2019s investments are attracting the attention of automakers and companies from around the world. We will continue to do everything to ensure that Canadians can benefit from the global transition to electric vehicles.&#8221;<\/p>\n<p>In April, the Volkswagen Group announced a <a href=\"https:\/\/www.electrive.com\/2023\/04\/21\/vw-subsidiary-powerco-is-building-a-90-gwh-battery-factory-in-canada\/\">90 GWh battery factory in Canada<\/a>, albeit located in the province of Ontario.<\/p>\n<p><a href=\"https:\/\/electricautonomy.ca\/2023\/05\/08\/scoop-northvolt-scouting-quebec-cities-canadian-battery-factory\/\" target=\"_blank\" rel=\"noopener\">electricautonomy.ca<\/a><\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/196244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=196244"}],"version-history":[{"count":1,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/196244\/revisions"}],"predecessor-version":[{"id":229850,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/196244\/revisions\/229850"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/173357"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=196244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=196244"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=196244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}