{"id":196458,"date":"2023-05-10T14:07:29","date_gmt":"2023-05-10T12:07:29","guid":{"rendered":"https:\/\/www.electrive.com\/?p=196458"},"modified":"2024-02-29T11:23:40","modified_gmt":"2024-02-29T10:23:40","slug":"eve-energy-construira-una-fabrica-de-baterias-en-hungria","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/05\/10\/eve-energy-to-build-battery-factory-in-hungary\/","title":{"rendered":"Eve Energy construir\u00e1 una f\u00e1brica de bater\u00edas en Hungr\u00eda"},"content":{"rendered":"<p>El fabricante chino de c\u00e9lulas de bater\u00edas Eve Energy construir\u00e1 su primera f\u00e1brica europea en Debrecen (Hungr\u00eda) para suministrar a BMW c\u00e9lulas redondas de gran tama\u00f1o destinadas a los coches el\u00e9ctricos de nueva generaci\u00f3n. Ya se hab\u00eda insinuado antes - y ahora se confirma oficialmente.<!--more--><\/p>\n<p>Seg\u00fan informan los medios de comunicaci\u00f3n h\u00fangaros bas\u00e1ndose en declaraciones oficiales del ministro de Asuntos Exteriores de Hungr\u00eda, P\u00e9ter Szijj\u00e1rt\u00f3, y en un anuncio de Eve Energy, la f\u00e1brica de Debrecen tendr\u00e1 una capacidad anual de 28 gigavatios-hora y entrar\u00e1 en funcionamiento en 2026. Seg\u00fan Szijj\u00e1rt\u00f3, Eve Energy invertir\u00e1 unos 400.000 millones de forints (algo m\u00e1s de 1.000 millones de euros) en la f\u00e1brica y crear\u00e1 m\u00e1s de 1.000 nuevos puestos de trabajo. El gobierno h\u00fangaro apoya la construcci\u00f3n con 14.000 millones de forints, el equivalente a unos 38 millones de euros.<\/p>\n<p>La planta de c\u00e9lulas se construir\u00e1 en 45 hect\u00e1reas en el llamado Cintur\u00f3n Econ\u00f3mico del Noroeste, reservado a los proveedores de BMW. El propio fabricante de autom\u00f3viles alem\u00e1n puso la primera piedra de su planta de coches el\u00e9ctricos en Debrecen en <a href=\"https:\/\/www.electrive.com\/es\/2022\/06\/02\/bmw-pone-los-cimientos-de-una-fabrica-en-hungria\/\">mediados de 2022<\/a> y a finales del verano y oto\u00f1o de 2022 design\u00f3 a un total de tres proveedores para producir las nuevas c\u00e9lulas de bater\u00eda de formato redondo de los modelos el\u00e9ctricos de la \"Nueva Clase\". Adem\u00e1s de Eve Energy, se trata de CATL y Envision AESC. Juntos cubrir\u00e1n las regiones de Norteam\u00e9rica, Europa y China con la construcci\u00f3n de seis f\u00e1bricas.<\/p>\n<p>Ahora est\u00e1 claro que Eve Energy va a contribuir con una planta en Europa. Esto ya se hab\u00eda insinuado: Seg\u00fan informes de finales de marzo de 2022, Eve Energy ya hab\u00eda firmado entonces una carta de intenciones no vinculante con el municipio de Debrecen para adquirir 45 hect\u00e1reas en una zona industrial y construir all\u00ed una planta de producci\u00f3n de c\u00e9lulas cil\u00edndricas. M\u00e1s recientemente, Eve Energy tambi\u00e9n ha aparecido en los titulares con una <a href=\"https:\/\/www.electrive.com\/es\/2023\/01\/03\/eve-energy-amplia-la-capacidad-de-fabricacion-de-baterias-en-china\/\">fuerte expansi\u00f3n de la capacidad en China<\/a>. Sin embargo, no se ha confirmado si los nuevos edificios anunciados incluir\u00e1n una planta exclusiva para BMW.<\/p>\n<p>Lo que est\u00e1 claro, sin embargo, es que Envision AESC cubrir\u00e1 las entregas de c\u00e9lulas norteamericanas para BMW. Una f\u00e1brica de Envision AESC anunciada en octubre para Carolina del Sur con hasta 30 GWh ser\u00e1 la primera de las dos instalaciones de producci\u00f3n previstas por la empresa en la regi\u00f3n dedicadas al suministro de BMW. Se espera que CATL complemente a Eve Energy en sus actividades de suministro en Europa y China. A\u00fan no se dispone de m\u00e1s detalles. Pero CATL tambi\u00e9n est\u00e1 creando una <a href=\"https:\/\/www.electrive.com\/es\/2022\/08\/12\/catl-construira-una-fabrica-de-baterias-en-hungria-con-mercedes-como-principal-cliente\/\">F\u00e1brica de 100 GWh en Debrecen<\/a>, con Mercedes como cliente principal.<\/p>","protected":false},"excerpt":{"rendered":"<p>El fabricante chino de c\u00e9lulas de bater\u00edas Eve Energy construir\u00e1 su primera f\u00e1brica europea en Debrecen (Hungr\u00eda) para suministrar a BMW c\u00e9lulas redondas de gran tama\u00f1o destinadas a los coches el\u00e9ctricos de nueva generaci\u00f3n.<\/p>","protected":false},"author":22,"featured_media":196394,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9927],"tags":[10230,13682,10914,56,15586,18735,10210,13946],"class_list":["post-196458","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-fuel-cell","tag-batteries","tag-battery-cells","tag-battery-production","tag-bmw","tag-debrecen","tag-eve-energy","tag-hungary","tag-suppliers"],"acf":{"inhalt_teil2":"<p>BMW&#8217;s round cells will have a <a href=\"https:\/\/www.electrive.com\/2022\/09\/09\/bmw-confirms-use-of-round-battery-cells-for-new-class\/\">uniform diameter of 46 millimetres<\/a> and two different heights (format: 46XX). According to BMW, the module level is omitted during installation: the round cells are &#8220;integrated flexibly and space-savingly in the installation space&#8221;. The storage system takes on a supporting role in the body structure. In technical jargon, this battery concept is called &#8220;pack-to-open-body&#8221;.<\/p>\n<p>It has been known for some time that the vehicles of the New Class will use an 800-volt system with up to 350 kW charging power in addition to this battery concept. In this way, a significantly increased charging performance can be achieved with direct current charging at a current strength of up to 500 amperes, as BMW recently specified. &#8220;The time required for charging from ten to 80 per cent is reduced by up to 30 per cent.&#8221;<\/p>\n<p><a href=\"http:\/\/www.china.org.cn\/world\/Off_the_Wire\/2023-05\/10\/content_85276264.htm\" target=\"_blank\" rel=\"noopener\">china.org.cn<\/a>,\u00a0<a href=\"https:\/\/www.budapesttimes.hu\/corporate\/chinas-eve-power-building-first-european-plant-in-hungary\/\" target=\"_blank\" rel=\"noopener\">budapesttimes.hu<\/a>,\u00a0<a href=\"https:\/\/hirado.hu\/belfold\/cikk\/2023\/05\/09\/szijjarto-peter-400-milliard-forintbol-debrecenben-epiti-fel-elso-europai-uzemet-a-kinai-eve-energy\" target=\"_blank\" rel=\"noopener\">hirado.hu<\/a>\u00a0(auf Ungarisch)<\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/196458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=196458"}],"version-history":[{"count":1,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/196458\/revisions"}],"predecessor-version":[{"id":229848,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/196458\/revisions\/229848"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/196394"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=196458"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=196458"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=196458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}