{"id":202605,"date":"2023-07-13T11:36:33","date_gmt":"2023-07-13T09:36:33","guid":{"rendered":"https:\/\/www.electrive.com\/?p=202605"},"modified":"2023-07-13T11:36:33","modified_gmt":"2023-07-13T09:36:33","slug":"alemania-tesla-iniciara-el-proceso-de-ampliacion-de-su-fabrica-en-julio","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/07\/13\/germany-tesla-to-begin-factory-expansion-process-in-july\/","title":{"rendered":"Alemania: Tesla iniciar\u00e1 el proceso de ampliaci\u00f3n de su f\u00e1brica en julio"},"content":{"rendered":"<p>Tesla no s\u00f3lo planea duplicar su capacidad de producci\u00f3n de coches el\u00e9ctricos como parte de la ampliaci\u00f3n de su f\u00e1brica en Alemania, sino tambi\u00e9n la de bater\u00edas. As\u00ed, la participaci\u00f3n p\u00fablica en el proceso de aprobaci\u00f3n de la ampliaci\u00f3n de la f\u00e1brica de Tesla en Gr\u00fcnheide se iniciar\u00e1 a partir del 19 de julio de 2023.<!--more--><\/p>\n<p>Esto es seg\u00fan una declaraci\u00f3n del Ministerio de Medio Ambiente de Brandenburgo. En <a href=\"https:\/\/www.electrive.com\/es\/2023\/03\/16\/grunheide-tesla-presenta-la-solicitud-de-ampliacion-de-la-planta\/\">Marzo de 2023<\/a>, Tesla present\u00f3 la primera solicitud para la ampliaci\u00f3n de su planta de Gr\u00fcnheide. Ya se sab\u00eda que Tesla solicitaba ampliar su capacidad de producci\u00f3n de las 500.000 unidades actuales a un mill\u00f3n de coches el\u00e9ctricos al a\u00f1o en el futuro. Seg\u00fan ha anunciado ahora el ministerio, la ampliaci\u00f3n ir\u00e1 acompa\u00f1ada tambi\u00e9n de \"un aumento de la capacidad de producci\u00f3n de almacenamiento de bater\u00edas de los 50 actuales a 100 gigavatios-hora anuales en el futuro\".<\/p>\n<p>Tesla hab\u00eda <a href=\"https:\/\/www.electrive.com\/es\/2022\/09\/15\/se-rumorea-que-tesla-pospone-la-produccion-de-baterias-en-alemania\/\">pospuso sus planes<\/a> para la producci\u00f3n en serie de c\u00e9lulas de bater\u00edas en Gr\u00fcnheide con el fin de dar prioridad a EE.UU. por el momento debido a la perspectiva de amplias subvenciones. La nueva informaci\u00f3n confirma que Tesla sigue apostando por la producci\u00f3n de bater\u00edas en Alemania. Sin embargo, el ministerio no especifica en su anuncio qu\u00e9 se entiende exactamente por \"capacidad de producci\u00f3n de bater\u00edas\". Esto podr\u00eda incluir la tan esperada producci\u00f3n de c\u00e9lulas de bater\u00eda, pero tambi\u00e9n (por ahora) s\u00f3lo un ensamblaje de paquetes de bater\u00edas. Por supuesto, esto tambi\u00e9n ser\u00e1 necesario m\u00e1s adelante, pero en un principio puede funcionar con las c\u00e9lulas suministradas. Porque est\u00e1 claro que un \"aumento a partir de los 50 GWh actuales\" no puede significar la producci\u00f3n de c\u00e9lulas, ya que Tesla no construye c\u00e9lulas de bater\u00eda a esta escala en Gr\u00fcnheide. Adem\u00e1s, no se menciona el horizonte temporal para duplicar la \"capacidad de producci\u00f3n de almacenamiento de bater\u00edas\".<\/p>\n<p>Para duplicar la producci\u00f3n de veh\u00edculos, \"se construir\u00e1 otra gran nave para albergar las unidades de producci\u00f3n adicionales\". Adem\u00e1s, tambi\u00e9n est\u00e1n previstas modificaciones y optimizaciones de las instalaciones de producci\u00f3n ya construidas, seg\u00fan el Ministerio de Medio Ambiente del Estado de Brandeburgo.<\/p>\n<h3>Tesla cambia de enfoque<\/h3>\n<p>Tesla tambi\u00e9n parece estar cambiando su enfoque de la concesi\u00f3n de permisos. Para la construcci\u00f3n de la primera fase, el fabricante hab\u00eda trabajado famosamente con innumerables permisos preliminares (con el riesgo de desmantelamiento a su costa), incluso antes de disponer del permiso global completo. Ahora, seg\u00fan el Ministerio estatal de Medio Ambiente, Tesla planea \"solicitar el proyecto en varios pasos de aprobaci\u00f3n parcial\".<\/p>","protected":false},"excerpt":{"rendered":"<p>Tesla no s\u00f3lo planea duplicar su capacidad de producci\u00f3n de coches el\u00e9ctricos con la ampliaci\u00f3n de su f\u00e1brica en Alemania, sino tambi\u00e9n la de bater\u00edas.<\/p>","protected":false},"author":22,"featured_media":181132,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9930],"tags":[10230,13682,10914,3701,14746,9961,3203,19081,19563,8516,509],"class_list":["post-202605","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-automobile","tag-batteries","tag-battery-cells","tag-battery-production","tag-bev","tag-brandenburg","tag-germany","tag-gigafactory","tag-gigafactory-4","tag-grunheide","tag-model-y","tag-tesla"],"acf":{"inhalt_teil2":"<p>The application is officially a modification of approved production facilities, which were approved by the decision of 04.03.2022. The project is planned entirely within the area of the existing B-Plan. There is no connection between this project and B-Plan No. 60 &#8220;Service and Logistics Centre Freienbrink-Nord&#8221;, which is currently being drawn up.<\/p>\n<p>Part of the requested change is also a further development of the much-criticised waste water treatment. &#8220;This means that in future the waste water from production will be treated by additional recycling and treatment in such a way that no more industrial waste water will be fed to the sewage treatment plant. This is intended to save required production water,&#8221; the ministry writes.<\/p>\n<p>The application documents can be viewed on the internet and at some authorities from 19 July to 18 August 2023. During the period from 19 July to 18 September 2023 inclusive, objections to the project can be submitted in writing or electronically to the above-mentioned authorities. If there are any objections (which is to be assumed given the history of the plant), a hearing will again be held. According to the notification, this should take place in the Erkner town hall from 23 October this year.<\/p>\n<p><a href=\"https:\/\/mluk.brandenburg.de\/mluk\/de\/aktuelles\/presseinformationen\/detail\/~12-07-2023-start-der-oeffentlichkeitsbeteiligung-im-genehmigungsverfahren-zur-erweiterung-des-tesla#\" target=\"_blank\" rel=\"noopener\">brandenburg.de<\/a>,\u00a0<a href=\"https:\/\/bravors.brandenburg.de\/sixcms\/media.php\/76\/Amtsblatt%2027S_23.pdf\" target=\"_blank\" rel=\"noopener\">brandenburg.de<\/a> (PDF, both in German)<\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/202605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=202605"}],"version-history":[{"count":0,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/202605\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/181132"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=202605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=202605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=202605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}