{"id":202847,"date":"2023-07-14T16:03:55","date_gmt":"2023-07-14T14:03:55","guid":{"rendered":"https:\/\/www.electrive.com\/?p=202847"},"modified":"2023-07-14T16:03:55","modified_gmt":"2023-07-14T14:03:55","slug":"fastned-entra-en-el-mercado-escandinavo-a-traves-de-dinamarca","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/07\/14\/fastned-enters-the-scandinavian-market-via-denmark\/","title":{"rendered":"Fastned entra en el mercado escandinavo a trav\u00e9s de Dinamarca"},"content":{"rendered":"<p>La empresa holandesa de recarga Fastned anuncia las primeras instalaciones en Dinamarca. Una vez completados, los tres nuevos centros de recarga r\u00e1pida marcar\u00e1n la entrada de la empresa en el mercado del pa\u00eds y de Escandinavia en su conjunto. Fastned a\u00f1ade que gan\u00f3 todas las licitaciones a las que se present\u00f3 ante las autoridades danesas.<!--more--><\/p>\n<p>Seg\u00fan el anuncio, los nuevos parques de carga de Fastned ofrecer\u00e1n 24 columnas de carga en total, cada una con una capacidad de 400 kW. Cuatro cargadores r\u00e1pidos se encontrar\u00e1n en los emplazamientos de Helsing\u00f8r y Grevinge, cuya entrada en funcionamiento est\u00e1 prevista para finales de 2023. El centro de Langeskov Syd abrir\u00e1 sus puertas el pr\u00f3ximo verano y se espera que se convierta en un centro neur\u00e1lgico - m\u00e1s sobre esto dentro de un rato.<\/p>\n<p>El operador del punto de recarga no ha revelado los fabricantes de las estaciones de recarga. <a href=\"https:\/\/www.electrive.com\/es\/2022\/12\/21\/fastned-evbox-install-400-kw-charging\/\">Seg\u00fan se informa<\/a>, Fastned ha utilizado equipos de 400 kW de EVBox en los Pa\u00edses Bajos durante m\u00e1s de medio a\u00f1o a modo de prueba; el <a href=\"https:\/\/www.electrive.com\/es\/2023\/06\/09\/evbox-abre-la-cartera-de-pedidos-para-un-cargador-de-400-kw\/\">EVBox Troniq de alta potencia<\/a> est\u00e1 oficialmente disponible para pedidos desde principios de junio. En la mayor\u00eda de los nuevos emplazamientos, sin embargo, Fastned conf\u00eda en el acreditado hipercargador HYC300 de Alpitronic - del que, como es bien sabido, existe una versi\u00f3n de 400 kW denominada <a href=\"https:\/\/www.electrive.com\/es\/2022\/05\/17\/alpitronic-presenta-un-cargador-rapido-de-400-kw\/\">HYC400<\/a> ya est\u00e1 tambi\u00e9n disponible.<\/p>\n<p>\"Entrar en el mercado dan\u00e9s es un gran logro para Fastned y nos ayudar\u00e1 con nuestro objetivo de construir 1.000 estaciones de recarga r\u00e1pida en toda Europa para 2030\", declar\u00f3 Michiel Langezaal, consejero delegado de Fastned.<br \/>\nDinamarca es el s\u00e9ptimo pa\u00eds de la red. \"Nuestro equipo est\u00e1 trabajando duro para ampliar nuestra red a m\u00e1s pa\u00edses europeos\", as\u00ed Langezaal.<\/p>","protected":false},"excerpt":{"rendered":"<p>La empresa holandesa de recarga Fastned anuncia las primeras instalaciones en Dinamarca. Una vez completados, los tres nuevos centros de recarga r\u00e1pida marcar\u00e1n la entrada de la empresa en el mercado del pa\u00eds y<\/p>","protected":false},"author":21,"featured_media":202797,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[10174,7548,10188,1393,9221,28556],"class_list":["post-202847","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-charging-stations","tag-dc","tag-denmark","tag-fastned","tag-hpc","tag-vejdirektoratet"],"acf":{"inhalt_teil2":"<p>The winning bids were part of a tender process of nine locations, and Fastneds adds it had applied for the three sites that fit its &#8220;high-traffic location strategy&#8221; best.<\/p>\n<p>The hub in Helsing\u00f8r will allow drivers to charge before they head to Sweden on the ferry to Helsingborg. Grevinge station connects Copenhagen and Aarhus. The third and most prominent location, Langeskov Syd, will have 16 chargers. It borders the E20 motorway, where the long Great Belt and the New Little Belt bridges connect continental Europe to Sj\u00e6lland island, where Copenhagen is located.<\/p>\n<p><a href=\"https:\/\/fastnedcharging.com\/hq\/fastned-expands-into-denmark-and-wins-tender-to-build-3-new-fast-charging-stations-with-400-kw-chargers\/\" target=\"_blank\" rel=\"noopener\">fastnedcharging.com<\/a><\/p>\n"},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/202847","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=202847"}],"version-history":[{"count":0,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/202847\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/202797"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=202847"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=202847"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=202847"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}