{"id":211116,"date":"2023-10-06T15:04:48","date_gmt":"2023-10-06T13:04:48","guid":{"rendered":"https:\/\/www.electrive.com\/?p=211116"},"modified":"2023-12-20T13:43:14","modified_gmt":"2023-12-20T12:43:14","slug":"autel-se-prepara-para-producir-cargadores-ev-en-carolina-del-norte","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/10\/06\/autel-gets-ready-to-produce-ev-chargers-in-north-carolina\/","title":{"rendered":"Autel se prepara para producir cargadores de VE en Carolina del Norte"},"content":{"rendered":"<div class=\"module-richtext\" >\n  <p>Autel comenzar\u00e1 a producir su MaxiCharger 180kw-240kw DC Fast en Carolina del Norte a finales de este mes. La empresa aspira a alcanzar una capacidad anual de 5.000 unidades. Autel compr\u00f3 las instalaciones de 200.000 pies cuadrados en Greensboro, en el estado norteamericano, a principios de este a\u00f1o y desde entonces las ha modernizado.<\/p>\n<p>Seg\u00fan el fabricante, el MaxiCharger 180kw-240kw DC Fast cumple los requisitos para el US <a href=\"https:\/\/www.electrive.com\/es\/2023\/02\/15\/la-casa-blanca-confirma-los-requisitos-de-nevi-consigue-que-tesla-se-suba-al-carro\/\">Infraestructura Nacional de Veh\u00edculos El\u00e9ctricos (NEVI)<\/a> programa de financiaci\u00f3n, y cumple los requisitos de \"Build America, Buy America\". Como parte del primero, el Departamento de Transporte y Energ\u00eda de EE.UU. aporta casi $5.000 millones de financiaci\u00f3n a lo largo de cinco a\u00f1os para ayudar a los estados a construir la red, sobre todo a lo largo de las autopistas.<\/p>\n<p><a href=\"https:\/\/www.electrive.com\/es\/2022\/10\/27\/autel-instala-sus-primeros-cargadores-rapidos-de-cc-en-el-reino-unido\/\">Autel<\/a> se fund\u00f3 en 2004 con el objetivo de desarrollar y suministrar productos y soluciones inteligentes de diagn\u00f3stico, inspecci\u00f3n y an\u00e1lisis para el sector de la automoci\u00f3n. Comenz\u00f3 a fabricar cargadores para veh\u00edculos el\u00e9ctricos en 2021 y actualmente est\u00e1 presente en m\u00e1s de 70 pa\u00edses, entre ellos EE.UU., Alemania y Reino Unido.<\/p>\n<p>Unas 150 personas trabajar\u00e1n en la planta de Carolina del Norte. En cinco a\u00f1os, la empresa espera crear 400 puestos de trabajo.<\/p>\n<p><a href=\"https:\/\/www.prnewswire.com\/news-releases\/autel-energy-starts-ev-charger-production-in-north-carolina-plant-301947868.html\" target=\"_blank\" rel=\"noopener nofollow\">prnewswire.com<\/a><\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":29,"featured_media":211122,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[26712,3701,10174,9575,609],"class_list":["post-211116","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-autel","tag-bev","tag-charging-stations","tag-north-carolina","tag-usa"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_thumbnail":211122,"post_teaser-text":"Autel hopes to produce 5,000 DC chargers a year at its new facility in the US. It had acquired the site earlier this year and modernised it. ","post_advert":false,"post_thumbnail-caption":"","post_tags":[26712,9575,10174,3701,609],"post_categories":[9933],"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/211116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=211116"}],"version-history":[{"count":3,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/211116\/revisions"}],"predecessor-version":[{"id":220517,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/211116\/revisions\/220517"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/211122"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=211116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=211116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=211116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}