{"id":212909,"date":"2023-10-24T15:55:47","date_gmt":"2023-10-24T13:55:47","guid":{"rendered":"https:\/\/www.electrive.com\/?p=212909"},"modified":"2023-10-25T12:03:56","modified_gmt":"2023-10-25T10:03:56","slug":"212909","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/10\/24\/212909\/","title":{"rendered":"Zero Carbon Charge para construir infraestructuras HPC en Sud\u00e1frica"},"content":{"rendered":"<p class=\"wp-block-paragraph\">La red de recarga para veh\u00edculos el\u00e9ctricos en Sud\u00e1frica va a ser reforzada por un nuevo proveedor. La empresa Zero Carbon Charge (ZeroCC) tiene previsto construir una red de estaciones de recarga ultrarr\u00e1pida a intervalos de unos 150 kil\u00f3metros a lo largo de rutas estrat\u00e9gicas fuera de las zonas urbanas en las nueve provincias de Sud\u00e1frica. La electricidad se generar\u00e1 localmente en cada caso, de modo que los cargadores r\u00e1pidos puedan abastecerse de energ\u00eda renovable independientemente de la red. En la primera fase, est\u00e1 previsto instalar al menos 120 de estas estaciones HPC antes del primer trimestre de 2025. <\/p>\n\n\n<div class=\"ad-space\" >\n      <div class=\"ad-space-block\">\n      <div class=\"adspace not-mobile rectangle-4\" id=\"article-content-1\"><\/div>\n      <div class=\"adspace not-desktop topmobile-2\" id=\"article-content-1-mobile\"><\/div>\n    <\/div>\n  <\/div>\n\n\n\n<p class=\"wp-block-paragraph\">La instalaci\u00f3n de la red nacional comenzar\u00e1 en la provincia del Noroeste, en la ruta N12. Sin embargo, no ser\u00e1 la primera instalaci\u00f3n de puntos de recarga a disposici\u00f3n del p\u00fablico en Sud\u00e1frica, ya que el honor corresponde a Audi, que instal\u00f3 43 cargadores ultrarr\u00e1pidos en enero, en colaboraci\u00f3n con Rubicon.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.businesslive.co.za\/bd\/life\/motoring\/2023-05-11-sa-to-get-more-ultra-fast-ev-chargers\/\" rel=\"nofollow noopener\" target=\"_blank\">businesslive.co.za<\/a>, <a href=\"https:\/\/www.motormoutharabia.com\/uncategorized\/off-grid-fast-charging-stations-across-sa-set-to-ease-ev-drivers-range-anxiety\/73526\/\" rel=\"nofollow noopener\" target=\"_blank\">motormoutharabia.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>La red de recarga para veh\u00edculos el\u00e9ctricos en Sud\u00e1frica va a ser reforzada por un nuevo proveedor. La empresa Zero Carbon Charge (ZeroCC) tiene previsto construir una<\/p>","protected":false},"author":22,"featured_media":212894,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[9221,10550,29136],"class_list":["post-212909","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-hpc","tag-south-africa","tag-zero-carbon-charge"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[9221,10550,29136],"post_thumbnail":212894,"post_thumbnail-caption":"","post_teaser-text":"Zero Carbon Charge wants to set up a new charging network in South Africa. The company plans to build ultra-fast charging stations every 150 kilometres along strategic routes outside urban areas across all provinces of South Africa.","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/212909","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=212909"}],"version-history":[{"count":3,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/212909\/revisions"}],"predecessor-version":[{"id":213052,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/212909\/revisions\/213052"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/212894"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=212909"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=212909"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=212909"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}