{"id":213467,"date":"2023-10-27T15:59:45","date_gmt":"2023-10-27T13:59:45","guid":{"rendered":"https:\/\/www.electrive.com\/?p=213467"},"modified":"2023-10-27T16:08:58","modified_gmt":"2023-10-27T14:08:58","slug":"epsilon-advanced-materials-construira-una-fabrica-de-anodos-de-grafito-en-ee-uu","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/10\/27\/epsilon-advanced-materials-to-build-graphite-anode-factory-in-the-us\/","title":{"rendered":"Epsilon Advanced Materials construir\u00e1 una f\u00e1brica de \u00e1nodos de grafito en EE.UU."},"content":{"rendered":"<p class=\"wp-block-paragraph\">Para 2031, se espera que la f\u00e1brica de Epsilon Advanced Materials (EAM) alcance su plena capacidad de 50.000 toneladas de \u00e1nodos de grafito al a\u00f1o, suficientes para las bater\u00edas de 1,1 millones de coches el\u00e9ctricos. EAM ya est\u00e1 en conversaciones con proveedores locales de materias primas y socios de transporte, seg\u00fan la empresa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Contar con unas instalaciones ecol\u00f3gicas de categor\u00eda mundial en Carolina del Norte resuelve las preocupaciones sobre la cadena de suministro que la industria automovil\u00edstica ha experimentado en los \u00faltimos a\u00f1os\", afirm\u00f3 Sunit Kapur, consejero delegado de EAM. \"Estamos orgullosos de que con nuestra capacidad tecnol\u00f3gica para fabricar tanto grafito natural como sint\u00e9tico, podremos suministrar \u00e1nodos de grafito a la creciente industria de bater\u00edas para veh\u00edculos el\u00e9ctricos de forma m\u00e1s r\u00e1pida, fiable y a un coste competitivo sin problemas de importaci\u00f3n.\"<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La instalaci\u00f3n se extiende sobre 1,5 millones de pies cuadrados y se espera que cree 500 puestos de trabajo. Seg\u00fan EAM, la instalaci\u00f3n es la primera y mayor inversi\u00f3n de una empresa india en el sector de las bater\u00edas para veh\u00edculos el\u00e9ctricos en Estados Unidos.<\/p>\n\n\n<div class=\"ad-space\" >\n      <div class=\"ad-space-block\">\n      <div class=\"adspace not-mobile rectangle-4\" id=\"article-content-1\"><\/div>\n      <div class=\"adspace not-desktop topmobile-2\" id=\"article-content-1-mobile\"><\/div>\n    <\/div>\n  <\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.businesswire.com\/news\/home\/20231026819379\/en\/Epsilon-Advanced-Materials-EAM-Announces-Investment-of-650M-Manufacturing-Facility-in-North-Carolina-to-Strengthen-EV-Battery-Industry-in-the-United-States\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">businesswire.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Para 2031, se espera que la f\u00e1brica de Epsilon Advanced Materials (EAM) alcance su plena capacidad de 50.000 toneladas de \u00e1nodos de grafito al a\u00f1o, suficientes para las bater\u00edas<\/p>","protected":false},"author":22,"featured_media":213468,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9927],"tags":[10230,13682,10914,26792,9575,609],"class_list":["post-213467","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-fuel-cell","tag-batteries","tag-battery-cells","tag-battery-production","tag-epsilon-advanced-materials","tag-north-carolina","tag-usa"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9927],"post_tags":[609,9575,26792,13682,10914,10230],"post_thumbnail":213468,"post_thumbnail-caption":"","post_teaser-text":"The Indian battery materials company is investing 650 million US dollars in the new production facility in Brunswick County, North Carolina. Construction is scheduled to begin in 2024 and production is planned to start in 2026","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/213467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=213467"}],"version-history":[{"count":3,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/213467\/revisions"}],"predecessor-version":[{"id":213473,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/213467\/revisions\/213473"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/213468"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=213467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=213467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=213467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}