{"id":214491,"date":"2023-11-03T13:36:12","date_gmt":"2023-11-03T12:36:12","guid":{"rendered":"https:\/\/www.electrive.com\/?p=214491"},"modified":"2023-11-03T13:36:15","modified_gmt":"2023-11-03T12:36:15","slug":"evgo-prefabricara-puntos-de-recarga","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2023\/11\/03\/evgo-will-prefabricate-charging-sites\/","title":{"rendered":"EVgo prefabricar\u00e1 puntos de recarga"},"content":{"rendered":"<p class=\"wp-block-paragraph\">EVgo ofrecer\u00e1 un dise\u00f1o escalable para ubicaciones de recarga r\u00e1pida, empezando con seis cargadores r\u00e1pidos. El llamado \"enfoque de prefabricaci\u00f3n\" para la instalaci\u00f3n de nuevos cargadores de VE podr\u00eda reducir el tiempo de instalaci\u00f3n a la mitad y -para los emplazamientos elegibles- reducir los costes de construcci\u00f3n hasta en un 15%, afirma la empresa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La estructura prefabricada tambi\u00e9n tendr\u00e1 espacio para alojar elementos como WiFi, iluminaci\u00f3n, c\u00e1maras de seguridad e incluso marquesinas para ofrecer sombra en los d\u00edas soleados y proteger a los conductores de las inclemencias del tiempo\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Gracias a la prefabricaci\u00f3n, todo el equipo de recarga -incluidos los surtidores, los armarios el\u00e9ctricos y cualquier otro equipo necesario- se ensambla en un \u00fanico bastidor base antes de ser enviado al lugar de recarga r\u00e1pida\", explica EVgo en su comunicado de prensa.<\/p>\n\n\n<div class=\"ad-space\" >\n      <div class=\"ad-space-block\">\n      <div class=\"adspace not-mobile rectangle-4\" id=\"article-content-1\"><\/div>\n      <div class=\"adspace not-desktop topmobile-2\" id=\"article-content-1-mobile\"><\/div>\n    <\/div>\n  <\/div>\n\n\n\n<p class=\"wp-block-paragraph\">EVgo empezar\u00e1 a construir su primer proyecto de prefabricaci\u00f3n en Texas este mes. Otros emplazamientos se encuentran en Florida, Nebraska y Carolina del Norte y se ampliar\u00e1n a otros lugares el a\u00f1o que viene.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"En la actualidad hay unos 30.000 cargadores r\u00e1pidos en EE.UU. y, para 2030, los analistas del sector estiman que necesitaremos m\u00e1s de 300.000. Innovaciones como este modelo de prefabricaci\u00f3n son fundamentales para ampliar la red de EVgo y construir la infraestructura necesaria para satisfacer la creciente demanda de recarga p\u00fablica\", afirma Dennis Kish, director de operaciones de EVgo. \"Las estaciones prefabricadas no s\u00f3lo pueden ayudarnos a ahorrar tiempo y reducir costes, sino tambi\u00e9n a elevar la experiencia del cliente proporcionando caracter\u00edsticas populares que los conductores desean.\"<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.evgo.com\/press-release\/evgo-s-prefabricated-charging-infrastructure-deployment-model-expected-to-cut-installation-timelines-by-50-on-average\/\" rel=\"nofollow noopener\" target=\"_blank\">evgo.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>EVgo ofrecer\u00e1 un dise\u00f1o escalable para las ubicaciones de recarga r\u00e1pida, comenzando con seis cargadores r\u00e1pidos. El llamado \"enfoque de prefabricaci\u00f3n\" para instalar nuevos cargadores de VE podr\u00eda reducir el tiempo de instalaci\u00f3n<\/p>","protected":false},"author":29,"featured_media":214494,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[10174,7548,7512,2102,609],"class_list":["post-214491","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-charging-stations","tag-dc","tag-evgo","tag-texas","tag-usa"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[7512,609,10174,7548,2102],"post_thumbnail":214494,"post_teaser-text":"The scalable model is said to save time and money when constructing new EV charging sites. First projects are already underway, with more sites to follow across the US in 2024.","post_advert":false,"post_legacy":false,"post_thumbnail-caption":""},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/214491","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=214491"}],"version-history":[{"count":3,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/214491\/revisions"}],"predecessor-version":[{"id":214497,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/214491\/revisions\/214497"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/214494"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=214491"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=214491"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=214491"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}