{"id":228349,"date":"2024-02-15T13:26:11","date_gmt":"2024-02-15T12:26:11","guid":{"rendered":"https:\/\/www.electrive.com\/?p=228349"},"modified":"2024-02-15T13:26:13","modified_gmt":"2024-02-15T12:26:13","slug":"ford-abre-un-laboratorio-de-pruebas-de-propulsion-electrica-en-el-reino-unido","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2024\/02\/15\/ford-opens-electric-drive-testing-lab-in-the-uk\/","title":{"rendered":"Ford abre un laboratorio de pruebas de propulsi\u00f3n el\u00e9ctrica en el Reino Unido"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Ford invirti\u00f3 24 millones de libras en el nuevo laboratorio. Cuenta con ocho salas del tama\u00f1o de un veh\u00edculo en las que, entre otras cosas, el fabricante de autom\u00f3viles puede probar transmisiones el\u00e9ctricas. Ford especifica que estas salas de pruebas est\u00e1n configuradas \"para probar cadenas cinem\u00e1ticas EV, h\u00edbridas y de combusti\u00f3n, flexionando entre tecnolog\u00edas en previsi\u00f3n de los cambios del mercado y los requisitos de los clientes.\"<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En los dos \u00faltimos a\u00f1os, Ford tambi\u00e9n ha invertido 47 millones de libras en el vecino Laboratorio de Propulsi\u00f3n Avanzada (APL) y en la instalaci\u00f3n de prototipos EV:PRiME (Electrified Powertrain in Manufacturing Engineering). El primero est\u00e1 especializado en minimizar el ruido y las vibraciones de las cadenas cinem\u00e1ticas de los VE y en desarrollar cadenas cinem\u00e1ticas h\u00edbridas para las \u00faltimas normativas sobre emisiones. E:PRIME se concentra en la producci\u00f3n de prototipos de componentes de VE antes de la producci\u00f3n en serie.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Esta es la tercera nueva instalaci\u00f3n de pruebas que se abre en nuestro campus de Dunton en dos a\u00f1os, apuntalando el papel clave del emplazamiento en el cumplimiento del plan de veh\u00edculos el\u00e9ctricos de Ford en Europa\", afirma Lisa Brankin, presidenta y directora general de Ford Gran Breta\u00f1a e Irlanda.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La empresa estadounidense tambi\u00e9n est\u00e1 invirtiendo 380 millones de libras en el <a href=\"https:\/\/www.electrive.com\/es\/2022\/12\/01\/reino-unido-ford-construye-una-planta-de-unidades-de-potencia-en-halewood\/\">Planta de transmisi\u00f3n brit\u00e1nica en Halewood<\/a> para producir componentes de veh\u00edculos el\u00e9ctricos. El objetivo es aumentar la producci\u00f3n hasta 420.000 unidades al a\u00f1o y equipar el 70% de los veh\u00edculos el\u00e9ctricos Ford a la venta en Europa para 2026. Ford dice que lanzar\u00e1 nueve nuevas furgonetas y coches el\u00e9ctricos para 2025, \"incluidos cinco veh\u00edculos basados en furgonetas\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/media.ford.com\/content\/fordmedia\/feu\/gb\/en\/news\/2024\/02\/14\/ford-expands-electric-vehicle-test-laboratories-at-uk-headquarte.html\" rel=\"nofollow noopener\" target=\"_blank\">ford.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Ford invirti\u00f3 24 millones de libras en el nuevo laboratorio. Cuenta con ocho salas del tama\u00f1o de un veh\u00edculo en las que, entre otras cosas, el fabricante de autom\u00f3viles puede probar propulsores el\u00e9ctricos. Ford especifica<\/p>","protected":false},"author":29,"featured_media":228354,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9930],"tags":[15713,1742,15264,209,29668,2158],"class_list":["post-228349","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-automobile","tag-drives","tag-england","tag-essex","tag-ford","tag-propulsion-development-laboratory","tag-uk"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9930],"post_tags":[209,15713,2158,29668,15264,1742],"post_thumbnail":228354,"post_thumbnail-caption":"","post_teaser-text":"Ford has opened a new EV powertrain test laboratory at its UK headquarters in Essex. The first tests at the new Propulsion Development Laboratory involved components for the E-Transit Courier, E-Transit Custom and Ford Puma Gen-E.","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/228349","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=228349"}],"version-history":[{"count":1,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/228349\/revisions"}],"predecessor-version":[{"id":228355,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/228349\/revisions\/228355"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/228354"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=228349"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=228349"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=228349"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}