{"id":228874,"date":"2024-02-20T14:38:39","date_gmt":"2024-02-20T13:38:39","guid":{"rendered":"https:\/\/www.electrive.com\/?p=228874"},"modified":"2024-02-20T15:54:27","modified_gmt":"2024-02-20T14:54:27","slug":"technotrans-suministrara-el-sistema-de-refrigeracion-para-la-estacion-de-recarga-ads-tec","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2024\/02\/20\/technotrans-to-supply-cooling-system-for-ads-tec-charging-station\/","title":{"rendered":"Technotrans suministrar\u00e1 un sistema de refrigeraci\u00f3n para la estaci\u00f3n de recarga ADS-TEC"},"content":{"rendered":"<p class=\"wp-block-paragraph\">El ChargePost basado en almacenamiento es una estaci\u00f3n de carga que puede proporcionar una capacidad de carga de hasta 300 kW. El sistema de carga rectangular, de 1,3 x 1,5 x 2,4 metros, cuenta con dos conexiones HPC, entre 144 y 201 kWh de capacidad de bater\u00eda y hasta dos pantallas publicitarias de 75 pulgadas en toda la altura de la superficie exterior.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El sistema Technotrans dispone tanto de refrigeraci\u00f3n activa mediante un refrigerador de compresor de potencia controlada como de refrigeraci\u00f3n pasiva mediante un refrigerador libre, tal y como la empresa explic\u00f3 su propia soluci\u00f3n el a\u00f1o pasado. La variante pasiva utiliza el aire ambiente para la refrigeraci\u00f3n y es, por tanto, \"especialmente eficiente desde el punto de vista energ\u00e9tico\", seg\u00fan el fabricante. ADS-TEC Energy tambi\u00e9n puede acceder al sistema a distancia para determinar las necesidades de mantenimiento y supervisar el funcionamiento.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Adem\u00e1s de la electr\u00f3nica de potencia y la unidad de almacenamiento de bater\u00edas, la soluci\u00f3n Technotrans tambi\u00e9n refrigera las dos grandes pantallas publicitarias. El sistema de refrigeraci\u00f3n se caracteriza, en particular, por una gran capacidad de refrigeraci\u00f3n en un espacio de instalaci\u00f3n muy reducido y un funcionamiento energ\u00e9ticamente eficiente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El nuevo pedido, con un volumen de un solo d\u00edgito de millones de euros y un plazo de un a\u00f1o, sigue a la perfecci\u00f3n de <a href=\"https:\/\/www.electrive.com\/es\/2023\/05\/08\/technotrans-se-asegura-un-acuerdo-millonario\/\">el primer pedido realizado en 2023<\/a>. La producci\u00f3n de las soluciones de refrigeraci\u00f3n comenzar\u00e1 en mayo de este a\u00f1o. Una vez m\u00e1s, los sistemas se fabricar\u00e1n en el centro de producci\u00f3n de Technotrans en Steinhagen.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.eqs-news.com\/de\/news\/corporate\/technotrans-receives-follow-up-order-for-fast-charging-station-cooling-from-ads-tec-energy\/1998875\" rel=\"nofollow noopener\" target=\"_blank\">ews-noticias.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>El ChargePost, basado en el almacenamiento, es una estaci\u00f3n de carga que puede proporcionar una capacidad de carga de hasta 300 kW. El sistema de carga rectangular, que mide 1,3 x 1,5 x<\/p>","protected":false},"author":22,"featured_media":199533,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[8401,14830,10174,7548,9221,13946,23855],"class_list":["post-228874","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-ads-tec","tag-battery-storage","tag-charging-stations","tag-dc","tag-hpc","tag-suppliers","tag-technotrans"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[23855,8401,10174,14830,13946,7548,9221],"post_thumbnail":199533,"post_thumbnail-caption":"","post_teaser-text":"Technotrans has received a follow-up order from ADS-TEC Energy in the high single-digit million euro range. Following last year's order, this is the second major order for Technotrans cooling solutions for the ChargePost battery storage fast-charging station from ADS-TEC Energy.","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/228874","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=228874"}],"version-history":[{"count":2,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/228874\/revisions"}],"predecessor-version":[{"id":228907,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/228874\/revisions\/228907"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/199533"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=228874"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=228874"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=228874"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}