{"id":229024,"date":"2024-02-21T16:19:15","date_gmt":"2024-02-21T15:19:15","guid":{"rendered":"https:\/\/www.electrive.com\/?p=229024"},"modified":"2024-02-21T17:11:16","modified_gmt":"2024-02-21T16:11:16","slug":"ontario-facilitara-la-instalacion-de-infraestructuras-ev","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2024\/02\/21\/ontario-to-facilitate-ev-infrastructure-installations\/","title":{"rendered":"Ontario facilitar\u00e1 la instalaci\u00f3n de infraestructuras para VE"},"content":{"rendered":"<p class=\"wp-block-paragraph\">En concreto, la medida entrar\u00e1 en vigor el 27 de mayo de 2024. Entonces, las 58 compa\u00f1\u00edas el\u00e9ctricas locales deber\u00e1n seguir los procedimientos simplificados para la instalaci\u00f3n de infraestructuras de VE. Eso incluye la aplicaci\u00f3n de formularios normalizados, plazos y requisitos de informaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ontario cuenta con varios programas para apoyar la adopci\u00f3n de veh\u00edculos el\u00e9ctricos y hacer m\u00e1s accesible la infraestructura de recarga de VE. El <a href=\"https:\/\/www.electrive.com\/es\/2023\/10\/23\/ontario-reserva-fondos-para-infraestructuras-de-recarga-comunitarias\/\">Programa EV ChargeON<\/a>, por ejemplo, ha destinado 91 millones CAD a la instalaci\u00f3n de cargadores p\u00fablicos de VE fuera de los grandes centros urbanos de Ontario. Tambi\u00e9n introdujo un \"plan de precios nocturnos ultrabajos\", por el que resulta m\u00e1s barato cargar un coche el\u00e9ctrico durante la noche. Adem\u00e1s, instal\u00f3 cargadores r\u00e1pidos \"en las 20 estaciones ONroute renovadas a lo largo de las autopistas m\u00e1s transitadas de la provincia, la 400 y la 401\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"A medida que el n\u00famero de propietarios de VE en Ontario sigue creciendo, nuestro gobierno est\u00e1 facilitando la tarea de poner palas en el suelo para construir la infraestructura cr\u00edtica necesaria para que los conductores puedan cargar sus veh\u00edculos donde y cuando lo necesiten\", declar\u00f3 Todd Smith, Ministro de Energ\u00eda. \"Este es s\u00f3lo otro paso que estamos dando para reducir la burocracia, aumentar la adopci\u00f3n de veh\u00edculos el\u00e9ctricos y utilizar nuestro suministro de electricidad limpia para apoyar la electrificaci\u00f3n del sector del transporte de Ontario\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Nuestro gobierno est\u00e1 allanando el camino hacia un futuro el\u00e9ctrico mediante la construcci\u00f3n de la infraestructura de recarga de VE que los conductores necesitan, donde la necesitan\", dijo Prabmeet Sarkaria, Ministro de Transporte. \"Al aumentar la accesibilidad de las estaciones p\u00fablicas de recarga de VE en toda la provincia, incluso para las comunidades rurales y del norte, estamos proporcionando opciones de viaje m\u00e1s sostenibles y convenientes para los conductores.\"<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/news.ontario.ca\/en\/release\/1004197\/ontario-making-it-easier-to-build-electric-vehicle-charging-stations\" rel=\"nofollow noopener\" target=\"_blank\">ontario.ca<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>En concreto, la medida entrar\u00e1 en vigor el 27 de mayo de 2024. Entonces, las 58 compa\u00f1\u00edas el\u00e9ctricas locales deber\u00e1n seguir los procedimientos simplificados para instalar infraestructuras para VE. Que<\/p>","protected":false},"author":29,"featured_media":181983,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[3701,9956,10174,7548,12102,5986],"class_list":["post-229024","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-bev","tag-canada","tag-charging-stations","tag-dc","tag-north-america","tag-ontario"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[5986,12102,9956,10174,7548,3701],"post_thumbnail":181983,"post_teaser-text":"Ontario is cutting the red tape for EV charging installation. According to the Canadian province's website, \"all local utilities will follow a streamlined process for EV charging connections\" from late May, making it easier to build public chargers.","post_advert":false,"post_legacy":false,"post_thumbnail-caption":""},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/229024","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=229024"}],"version-history":[{"count":3,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/229024\/revisions"}],"predecessor-version":[{"id":229032,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/229024\/revisions\/229032"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/181983"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=229024"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=229024"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=229024"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}