{"id":230186,"date":"2024-02-29T15:50:09","date_gmt":"2024-02-29T14:50:09","guid":{"rendered":"https:\/\/www.electrive.com\/?p=230186"},"modified":"2024-02-29T15:50:30","modified_gmt":"2024-02-29T14:50:30","slug":"burger-king-confia-en-los-cargadores-rapidos-de-allego-en-francia","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2024\/02\/29\/burger-king-relies-on-fast-chargers-from-allego-in-france\/","title":{"rendered":"Burger King instalar\u00e1 cargadores r\u00e1pidos de Allego en Francia"},"content":{"rendered":"<p class=\"wp-block-paragraph\">En el breve anuncio no queda claro cu\u00e1ntos puntos de recarga habr\u00e1 en cada lugar. Tampoco hay informaci\u00f3n sobre cu\u00e1ntos puntos de recarga instalar\u00e1 Allego en total. El trasfondo de esto es que depende, entre otras cosas, del consentimiento de los distintos propietarios de los terrenos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El comunicado de prensa afirma: \"La asociaci\u00f3n tiene el potencial de permitir el despliegue de un gran n\u00famero de puntos de recarga ultrarr\u00e1pida en los establecimientos del restaurante en Francia\". Los cargadores de alta potencia en los establecimientos de Burger King pretenden ampliar significativamente la red de recarga en Francia a partir de los 190 cargadores r\u00e1pidos actuales.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Adem\u00e1s, Allego est\u00e1 ampliando significativamente la infraestructura de recarga en Francia con nuevas asociaciones. Entre otras cosas, se van a instalar nada menos que 4.000 puntos de recarga en 400 establecimientos Carrefour. Sin embargo, la empresa tambi\u00e9n est\u00e1 instalando puntos de recarga en los cines Path\u00e9, los centros comerciales Klepierre y otros lugares de todo el pa\u00eds.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Para satisfacer la demanda del creciente mercado de veh\u00edculos el\u00e9ctricos en Europa, debemos desplegar r\u00e1pidamente cargadores de alta potencia en los lugares m\u00e1s convenientes para los conductores\", declar\u00f3 Mathieu Bonnet, Director General de Allego, y a\u00f1adi\u00f3: \"Este tipo de crecimiento no puede lograrse en solitario, por lo que debemos trabajar con socios afines para apoyar el considerable cambio que supone la e-movilidad. A trav\u00e9s de esta asociaci\u00f3n, podemos hacer que la recarga sea m\u00e1s accesible y agradable para que los conductores puedan viajar cada vez con mayor facilidad\". Allego refuerza su posici\u00f3n como una de las principales redes de recarga ultrarr\u00e1pida en Francia\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.businesswire.com\/news\/home\/20240227908488\/en\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">businesswire.com<\/a>,\u00a0<a href=\"https:\/\/ir.allego.eu\/events-publications\/press-releases\/detail\/74\/allego-enters-into-partnership-with-burger-king-france-to\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">allego.eu<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>En el breve anuncio no queda claro cu\u00e1ntos puntos de recarga habr\u00e1 en cada lugar. Tampoco hay informaci\u00f3n sobre cu\u00e1ntos puntos de recarga<\/p>","protected":false},"author":22,"featured_media":189033,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[5274,22003,10174,7548,9970,9221],"class_list":["post-230186","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-allego","tag-burger-king","tag-charging-stations","tag-dc","tag-france","tag-hpc"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[22003,5274,10174,7548,9221,9970],"post_thumbnail":189033,"post_thumbnail-caption":"","post_teaser-text":"Burger King has selected Allego as its preferred partner to drive forward the installation of high-power chargers at existing and future locations throughout France over the next three years. The first fast chargers are scheduled to go into operation in the third quarter of 2024.","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/230186","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=230186"}],"version-history":[{"count":2,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/230186\/revisions"}],"predecessor-version":[{"id":230190,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/230186\/revisions\/230190"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/189033"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=230186"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=230186"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=230186"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}