{"id":241678,"date":"2024-06-18T15:26:06","date_gmt":"2024-06-18T13:26:06","guid":{"rendered":"https:\/\/www.electrive.com\/?p=241678"},"modified":"2024-06-18T15:26:07","modified_gmt":"2024-06-18T13:26:07","slug":"hyundai-y-kia-adquieren-litio-de-sqm","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2024\/06\/18\/hyundai-and-kia-procure-lithium-from-sqm\/","title":{"rendered":"Hyundai y Kia adquieren litio de SQM"},"content":{"rendered":"<p class=\"wp-block-paragraph\">SQM no ha revelado detalles sobre la cantidad de litio que se suministrar\u00e1 ni sobre las condiciones financieras. La empresa chilena se limita a afirmar que el acuerdo es una \"fuerte motivaci\u00f3n\" para continuar su plan de expansi\u00f3n del hidr\u00f3xido de litio y que Hyundai y Kia han decidido asegurarse \"una parte\" de su futuro suministro de hidr\u00f3xido de litio de SQM. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">SQM puede producir actualmente unas 40.000 toneladas de hidr\u00f3xido de litio al a\u00f1o, una cifra que la empresa cit\u00f3 en su informe anual del primer trimestre, seg\u00fan <em>Reuters<\/em>. SQM extrae primero carbonato de litio en el Salar de Atacama y luego procesa el propio material en hidr\u00f3xido de litio como materia prima para la producci\u00f3n de bater\u00edas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">SQM planea ampliar significativamente su producci\u00f3n nacional para 2025, con un objetivo de 100.000 toneladas. A finales de mayo, SQM firm\u00f3 un acuerdo con la minera estatal Codelco para establecer una empresa conjunta destinada a aumentar significativamente la producci\u00f3n de litio en el Salar de Atacama. SQM tambi\u00e9n est\u00e1 invirtiendo en la ampliaci\u00f3n de capacidades en China y <a href=\"https:\/\/www.electrive.com\/es\/2024\/02\/14\/lges-obtiene-mas-litio-de-australia-occidental\/\">Australia<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Adem\u00e1s del Grupo Hyundai Motor, entre sus clientes se encuentran <a href=\"https:\/\/www.electrive.com\/es\/2023\/05\/23\/ford-se-asegura-el-litio-para-futuros-coches-electricos\/\">Ford<\/a> y los fabricantes surcoreanos de c\u00e9lulas <a href=\"https:\/\/www.electrive.com\/es\/2023\/07\/07\/lg-energy-solution-casi-duplica-el-pedido-de-litio-de-sqm\/\">LG Energy Solutions (LGES)<\/a> y SK On.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.reuters.com\/business\/autos-transportation\/chile-lithium-miner-sqm-reaches-supply-deal-with-hyundai-kia-2024-06-17\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">reuters.com<\/a>,\u00a0<a href=\"https:\/\/s25.q4cdn.com\/757756353\/files\/doc_news\/2024\/6\/PR_Hyundai-Kia_17Jun2024_eng.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">sqm.com<\/a>\u00a0(PDF)<\/p>","protected":false},"excerpt":{"rendered":"<p>SQM no ha revelado detalles sobre la cantidad de litio que se suministrar\u00e1 ni sobre las condiciones financieras. La empresa chilena se limita a afirmar que el acuerdo es un \"fuerte<\/p>","protected":false},"author":24,"featured_media":93785,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9927],"tags":[10914,5695,267,303,4391,16009,13169,10221,13511],"class_list":["post-241678","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-fuel-cell","tag-battery-production","tag-chile","tag-hyundai","tag-kia","tag-lithium","tag-lithium-hydroxide","tag-raw-materials","tag-south-korea","tag-sqm"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9927],"post_tags":[267,303,13511,5695,10221,16009,13169,10914,4391],"post_thumbnail":93785,"post_thumbnail-caption":"","post_teaser-text":"The Chilean lithium producer SQM has concluded a long-term purchase agreement with Hyundai and Kia to supply the two automotive companies with lithium hydroxide.","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/241678","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=241678"}],"version-history":[{"count":2,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/241678\/revisions"}],"predecessor-version":[{"id":241688,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/241678\/revisions\/241688"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/93785"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=241678"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=241678"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=241678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}