{"id":244635,"date":"2024-07-16T11:39:38","date_gmt":"2024-07-16T09:39:38","guid":{"rendered":"https:\/\/www.electrive.com\/?p=244635"},"modified":"2024-07-16T14:03:07","modified_gmt":"2024-07-16T12:03:07","slug":"eramet-inaugura-una-planta-de-extraccion-de-litio-en-argentina","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2024\/07\/16\/eramet-inaugurates-lithium-extraction-plant-in-argentina\/","title":{"rendered":"Eramet inaugura una planta de extracci\u00f3n de litio en Argentina"},"content":{"rendered":"<p class=\"wp-block-paragraph\">La nueva instalaci\u00f3n ser\u00e1 explotada por una empresa conjunta de la que Eramet posee la mayor\u00eda con un 50,1%, mientras que el resto pertenece al socio Tsingshan. Tsingshan es una empresa china de materias primas conocida por sus actividades en los mercados del acero y el n\u00edquel. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Aunque el inicio oficial de la producci\u00f3n est\u00e1 previsto para noviembre de 2024, no se espera que el aumento total de la producci\u00f3n se complete hasta mediados de 2025. Entonces, la planta producir\u00e1 unas 24.000 toneladas de carbonato de litio equivalente para bater\u00edas al a\u00f1o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En t\u00e9rminos de inversi\u00f3n, los socios declaran haber gastado unos 870 millones de d\u00f3lares para la primera fase. Esperan un EBITDA (beneficios antes de intereses, impuestos, depreciaciones y amortizaciones) de entre $210 y $315 millones, bas\u00e1ndose en una hip\u00f3tesis de precios a largo plazo de entre $15.000 y $20.000\/t-LCE.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Con la puesta en marcha de nuestra primera planta Centenario, Eramet se convertir\u00e1 en un actor global clave en la producci\u00f3n sostenible de litio, un metal cr\u00edtico para las bater\u00edas de los veh\u00edculos el\u00e9ctricos\", explic\u00f3 Christel Bories, Presidenta y Consejera Delegada del Grupo, a\u00f1adiendo: \"Esta inauguraci\u00f3n confirma nuestro liderazgo tecnol\u00f3gico y sostenible en toda la cadena de valor del litio, desde la exploraci\u00f3n hasta la extracci\u00f3n y el procesamiento\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Eramet parece centrarse por el momento en el yacimiento de Centenario-Ratones, en Argentina, y tiene planes en marcha para construir all\u00ed otra refiner\u00eda, que el consejo de administraci\u00f3n de la empresa hab\u00eda aprobado a finales de 2023. Un plan fracas\u00f3 para abrir una f\u00e1brica junto <a href=\"https:\/\/www.electrive.com\/es\/2024\/06\/25\/basf-emaret-cancela-sus-planes-para-una-refineria-de-niquel-y-cobalto-en-indonesia\/\">con BASF en Indonesia en junio<\/a>Sin embargo, la planta de reciclaje de bater\u00edas con Suez que se est\u00e1 construyendo en Dunkerque sigue en proyecto, asegurando el acceso a la otra cara del proceso de extracci\u00f3n del litio.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.eramet.com\/en\/news\/2024\/07\/eramet-inaugurates-its-direct-lithium-extraction-plant-in-argentina-becoming-the-first-european-company-to-produce-battery-grade-lithium-carbonate-at-industrial-scale\/\" rel=\"nofollow noopener\" target=\"_blank\">eramet.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>La nueva instalaci\u00f3n ser\u00e1 explotada por una empresa conjunta de la que Eramet posee la mayor\u00eda con un 50,1%, mientras que el resto pertenece al socio Tsingshan. Tsingshan es<\/p>","protected":false},"author":22,"featured_media":244643,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9927],"tags":[10055,10230,18531,6145,4391,13169,13512,13946,25375],"class_list":["post-244635","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-fuel-cell","tag-argentina","tag-batteries","tag-eramet","tag-joint-venture","tag-lithium","tag-raw-materials","tag-south-america","tag-suppliers","tag-tsingshan-group"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9927],"post_tags":[18531,25375,4391,10230,13946,13169,10055,6145,13512],"post_thumbnail":244643,"post_thumbnail-caption":"","post_teaser-text":"Production is scheduled to start in November 2024. At full capacity, the plant will produce 24,000 tonnes of battery-grade lithium carbonate per year, which corresponds to the demand for 600,000 electric vehicles.","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/244635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=244635"}],"version-history":[{"count":3,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/244635\/revisions"}],"predecessor-version":[{"id":244684,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/244635\/revisions\/244684"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/244643"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=244635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=244635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=244635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}