{"id":248085,"date":"2024-08-21T14:03:08","date_gmt":"2024-08-21T12:03:08","guid":{"rendered":"https:\/\/www.electrive.com\/?p=248085"},"modified":"2024-08-21T14:03:10","modified_gmt":"2024-08-21T12:03:10","slug":"travelcenters-of-america-construye-un-centro-de-recarga-de-camiones-electricos-en-california","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2024\/08\/21\/travelcenters-of-america-build-electric-truck-charging-hub-in-california\/","title":{"rendered":"TravelCenters of America construye un centro de recarga de camiones el\u00e9ctricos en California"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Los cargadores CCS entrar\u00e1n en funcionamiento el a\u00f1o que viene, mientras que el cargador MCS lo har\u00e1 en 2026. Seg\u00fan TA, \"proporcionar\u00e1 carga ultrarr\u00e1pida de CC para hasta cinco camiones simult\u00e1neamente\". El proyecto piloto se ha puesto en marcha en colaboraci\u00f3n con la Comisi\u00f3n de Energ\u00eda de California, y se dice que es la primera estaci\u00f3n de carga de acceso p\u00fablico del pa\u00eds para camiones medianos y pesados. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Las estaciones son suministradas por BP Pulse, que adquiri\u00f3 TA el a\u00f1o pasado. El cargador de megavatios ser\u00e1 uno de los primeros de la empresa en desplegarse. En palabras de TA, viene con \"una microrred integrada\", ya que el cargador obtiene su energ\u00eda de paneles solares montados en la marquesina y tiene 1 MWh de almacenamiento en bater\u00eda.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Esta estaci\u00f3n de carga para camiones est\u00e1 estrat\u00e9gicamente situada en la intersecci\u00f3n de dos de las autopistas interestatales m\u00e1s transitadas del pa\u00eds y es una ubicaci\u00f3n privilegiada para dar servicio a los operadores de flotas de camiones el\u00e9ctricos pioneros\", dijo Debi Boffa, CEO de TA. \"Estamos orgullosos de asumir un papel de liderazgo para llevar esta infraestructura a nuestros clientes de flotas y a otros conductores profesionales\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;\"La carga para camiones y turismos en las instalaciones de TravelCenters of America es una parte clave de la estrategia de bp pulse para llevar la carga ultrarr\u00e1pida de VE a los principales metros y a lo largo de los corredores de autopistas clave en todo EE.UU.\", dijo Sujay Sharma, consejero delegado de bp pulse Americas. \"Este proyecto demuestra a\u00fan m\u00e1s el compromiso de bp pulse y TA para apoyar a los clientes de flotas y es s\u00f3lo el comienzo de nuestros esfuerzos en la carga de camiones para construir una infraestructura de carga r\u00e1pida y fiable para apoyar a nuestros conductores de VE.\"<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.ta-petro.com\/newsroom\/travelcenters-of-america-to-build-one-of-nation-s-first-publicly-accessible-medium-and-heavy-duty-truck-charging-stations-at-ontario-california-travel-center\/\" rel=\"nofollow noopener\" target=\"_blank\">ta-petro.com <\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Los cargadores CCS entrar\u00e1n en funcionamiento el a\u00f1o que viene, mientras que el cargador MCS lo har\u00e1 en 2026. Seg\u00fan TA, \"proporcionar\u00e1 carga ultrarr\u00e1pida de CC para hasta<\/p>","protected":false},"author":29,"featured_media":248090,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[22052,9940,3315,10174,7548,11274,9221,23974,12102,5986,27345,609],"class_list":["post-248085","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-bp-pulse","tag-california","tag-ccs","tag-charging-stations","tag-dc","tag-electric-trucks","tag-hpc","tag-mcs","tag-north-america","tag-ontario","tag-travelcenters-of-america","tag-usa"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[27345,22052,11274,23974,3315,7548,9221,10174,5986,9940,609,12102],"post_thumbnail":248090,"post_thumbnail-caption":"","post_teaser-text":"TravelCenters of America (TA) has broken ground for its new charging hub for electric trucks in Ontario, California. It will feature four chargers with 400 kW each, and one megawatt charger.","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/248085","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=248085"}],"version-history":[{"count":3,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/248085\/revisions"}],"predecessor-version":[{"id":248099,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/248085\/revisions\/248099"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/248090"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=248085"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=248085"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=248085"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}