{"id":256636,"date":"2024-11-12T16:02:05","date_gmt":"2024-11-12T15:02:05","guid":{"rendered":"https:\/\/www.electrive.com\/?p=256636"},"modified":"2024-11-12T16:02:07","modified_gmt":"2024-11-12T15:02:07","slug":"abb-e-mobility-pone-en-servicio-la-primera-estacion-de-carga-a400-hpc","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2024\/11\/12\/abb-e-mobility-commissions-first-a400-hpc-charging-station\/","title":{"rendered":"ABB E-mobility pone en servicio la primera estaci\u00f3n de carga A400 HPC"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Seg\u00fan el comunicado de prensa, la \"instalaci\u00f3n proporcionar\u00e1 valiosos datos de pruebas de campo sobre el A400, ya que apoya las operaciones de la flota en ITD\", un concesionario de camiones el\u00e9ctricos. <a href=\"https:\/\/www.electrive.com\/es\/2023\/09\/21\/nikola-anuncia-un-nuevo-coo-y-se-instala-en-canada\/\">que tambi\u00e9n vende los camiones Clase 8 de Nikola<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Al apuntar a las tasas m\u00e1s altas de tiempo de actividad y \u00e9xito de carga con el A400, estamos estableciendo un nuevo y m\u00e1s alto est\u00e1ndar de la industria y redefiniendo lo que es posible. Junto con nuestros socios de ITD Industries, estamos desplegando el primer A400 de Norteam\u00e9rica y ofreciendo las soluciones m\u00e1s avanzadas, fluidas y fiables que existen\", dijo Brandt Hastings, Presidente de Norteam\u00e9rica de ABB E-mobility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ABB <a href=\"https:\/\/www.electrive.com\/es\/2024\/05\/15\/abb-presenta-una-nueva-estacion-de-recarga-de-400-kw\/\">dio a conocer el cargador de 400 kW en mayo de este a\u00f1o<\/a>. Ofrece dos conexiones con 200 kW de potencia de carga continua cada una o hasta 400 kW para un solo veh\u00edculo. La nueva estaci\u00f3n de carga mide 2,3 x 0,8 x 0,8 metros, es decir, ocupa 0,64 metros cuadrados de superficie. El cable tiene una longitud aproximada de 4,8 metros. La columna se maneja a trav\u00e9s de una pantalla de 32 pulgadas y el pago se realiza mediante un lector de tarjetas de cr\u00e9dito integrado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Como parte de nuestro plan estrat\u00e9gico para suministrar a nuestros clientes de flotas los mejores camiones de emisiones cero de su clase, nuestra asociaci\u00f3n con ABB E-mobility nos sit\u00faa a la vanguardia de la tecnolog\u00eda de carga r\u00e1pida, lo que contribuir\u00e1 a acelerar la adopci\u00f3n de los veh\u00edculos el\u00e9ctricos en el mercado canadiense del transporte por carretera\", declar\u00f3 Philip Turi, director de operaciones de ITD Industries.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/e-mobility.abb.com\/en\/news\/abb-e-mobility-a400-all-one-charger-power-electric-fleet-operations-itd-industries\" rel=\"nofollow noopener\" target=\"_blank\">abb.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Seg\u00fan el comunicado de prensa, la \"instalaci\u00f3n proporcionar\u00e1 valiosos datos de pruebas de campo sobre el A400 en su apoyo a las operaciones de flota en ITD\", un concesionario de camiones el\u00e9ctricos que<\/p>","protected":false},"author":29,"featured_media":256639,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[30056,14,9956,10174,7548,9221,28995,12102,11762],"class_list":["post-256636","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-a400","tag-abb","tag-canada","tag-charging-stations","tag-dc","tag-hpc","tag-itd-industries","tag-north-america","tag-toronto"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[14,30056,28995,9956,11762,12102,7548,9221,10174],"post_thumbnail":256639,"post_thumbnail_listing":false,"post_thumbnail-caption":"","post_teaser-text":"Charge point provider ABB E-Mobility has set up its first A400 All-in-One charger in North America. It was installed on the premises of ITD Industries in the Etobicoke district of Toronto, Canada.","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/256636","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=256636"}],"version-history":[{"count":3,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/256636\/revisions"}],"predecessor-version":[{"id":256642,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/256636\/revisions\/256642"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/256639"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=256636"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=256636"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=256636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}