{"id":263854,"date":"2025-02-13T13:00:00","date_gmt":"2025-02-13T12:00:00","guid":{"rendered":"https:\/\/www.electrive.com\/?p=263854"},"modified":"2025-02-13T12:52:13","modified_gmt":"2025-02-13T11:52:13","slug":"compleo-uk-instalara-cientos-de-cargadores-en-islington","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2025\/02\/13\/compleo-uk-to-install-hundreds-of-chargers-in-islington\/","title":{"rendered":"Compleo UK instalar\u00e1 cientos de cargadores en Islington"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Los primeros cargadores se instalar\u00e1n a principios de este a\u00f1o, y las m\u00e1s de 550 unidades se completar\u00e1n \"en los pr\u00f3ximos dos a\u00f1os\", afirma Compleo UK. No dice exactamente cu\u00e1ntos cargadores de CA y cu\u00e1ntos de CC construir\u00e1, s\u00f3lo que instalar\u00e1 y mantendr\u00e1 una \"mezcla de cargadores de CA y CC adaptados para satisfacer las diversas necesidades de la flota totalmente el\u00e9ctrica del Ayuntamiento de Islington, que va desde coches el\u00e9ctricos hasta autocares y camiones volquete\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La mayor\u00eda de los cargadores se instalar\u00e1n para la flota de residuos y reciclaje del municipio, en Cottage Road, Islington. De nuevo, no se menciona el n\u00famero exacto ni la potencia de carga.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Estamos encantados de apoyar a un ayuntamiento tan previsor como el de Islington\", declar\u00f3 Matthew Downs, responsable de desarrollo empresarial de Compleo UK. \"Siempre buscan soluciones sostenibles y estamos orgullosos de suministrarles soluciones de carga de VE a prueba de futuro\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La concejala Rowena Champion, miembro ejecutivo de Medio Ambiente, Calidad del Aire y Transporte, a\u00f1adi\u00f3: \"Nos hemos comprometido a crear un Islington m\u00e1s ecol\u00f3gico y saludable, y esta asociaci\u00f3n con Compleo es un paso vital para reducir nuestra huella de carbono y mejorar la calidad del aire para nuestros residentes. Al electrificar nuestra flota, estamos predicando con el ejemplo y demostrando que la sostenibilidad y la eficiencia pueden ir de la mano.\"<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No es la primera vez que Islington pone el foco en la electrificaci\u00f3n de su flota de recogida de residuos. <a href=\"https:\/\/www.electrive.com\/es\/2023\/11\/06\/infraestructura-municipal-de-recarga-finalizada-en-islington\/\">En 2023<\/a>, el ayuntamiento del norte de Londres anunci\u00f3 que hab\u00eda instalado \"cientos\" de cargadores de veh\u00edculos para coches peque\u00f1os y veh\u00edculos de recogida de basuras de hasta 26 toneladas. En ese momento, la flota del ayuntamiento inclu\u00eda 80 veh\u00edculos totalmente el\u00e9ctricos, como volquetes jaula y minibuses el\u00e9ctricos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/compleocharging.co.uk\/compleo-energizes-islingtons-council-fleet-with-1-2m-ev-charging-project\/\" rel=\"nofollow noopener\" target=\"_blank\">compleocharging.es <\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Los primeros cargadores se instalar\u00e1n a principios de este a\u00f1o, y las m\u00e1s de 550 unidades se completar\u00e1n \"en los pr\u00f3ximos dos a\u00f1os\", afirma Compleo UK. No<\/p>","protected":false},"author":29,"featured_media":263863,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[5755,10174,23752,7548,1742,13538,840,2158],"class_list":["post-263854","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-ac","tag-charging-stations","tag-compleo","tag-dc","tag-england","tag-islington","tag-london","tag-uk"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[23752,10174,13538,840,1742,2158,5755,7548],"post_thumbnail":263863,"post_thumbnail_listing":false,"post_teaser-text":"Compleo UK has won a tender to install more than 500 EV chargers in the London borough of Islington, to charge the council's EV fleet. These will include AC and DC chargers, with a special focus on the borough's waste and recycling centre.","post_advert":false,"post_legacy":false,"post_thumbnail-caption":""},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/263854","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=263854"}],"version-history":[{"count":2,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/263854\/revisions"}],"predecessor-version":[{"id":263865,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/263854\/revisions\/263865"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/263863"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=263854"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=263854"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=263854"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}