{"id":268266,"date":"2025-04-02T10:04:14","date_gmt":"2025-04-02T08:04:14","guid":{"rendered":"https:\/\/www.electrive.com\/?p=268266"},"modified":"2025-04-02T10:04:15","modified_gmt":"2025-04-02T08:04:15","slug":"ads-tec-energy-suministrara-cargadores-de-c-c-con-amortiguacion-de-baterias-a-q8","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2025\/04\/02\/ads-tec-energy-to-supply-battery-buffered-dc-chargers-to-q8\/","title":{"rendered":"ADS-TEC Energy suministrar\u00e1 cargadores de corriente continua con bater\u00eda a Q8"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Las soluciones de carga de ADS-TEC Energy ofrecen hasta 320 kW. Al estar equipadas con una bater\u00eda tamp\u00f3n, pueden suministrar este tipo de potencia sin necesidad de grandes ampliaciones de la red. La bater\u00eda tamp\u00f3n carga lentamente la corriente alterna de la red y libera r\u00e1pidamente la energ\u00eda extra cuando se enchufa un coche. Ambas empresas se\u00f1alan que la capacidad de la red en B\u00e9lgica y los Pa\u00edses Bajos suele ser limitada, por lo que Q8 opt\u00f3 por las estaciones de carga r\u00e1pida de estos \u00faltimos pa\u00edses.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Estamos orgullosos de que Q8 nos haya elegido como socio para impulsar la expansi\u00f3n de la movilidad el\u00e9ctrica en B\u00e9lgica y los Pa\u00edses Bajos\", declar\u00f3 Thomas Speidel, director general y fundador de ADS-TEC Energy. La limitada capacidad de la red es uno de los mayores retos a la hora de construir una red de recarga r\u00e1pida generalizada. Esta asociaci\u00f3n demuestra que la innovadora tecnolog\u00eda de almacenamiento en bater\u00edas es un elemento crucial para la movilidad del futuro.\"<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Q8 se compromete a satisfacer las necesidades cambiantes de todos los conductores de veh\u00edculos el\u00e9ctricos de carga (r\u00e1pida) en toda B\u00e9lgica y los Pa\u00edses Bajos, incluso en lugares en los que, debido a la congesti\u00f3n de la red, la capacidad de la red disponible es limitada\", declar\u00f3 Geert De Mil, director de tecnolog\u00eda de carga, sistemas e informaci\u00f3n de Q8.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El ChargePost se introdujo<a href=\"https:\/\/www.electrive.com\/es\/2022\/05\/25\/ads-tec-combina-los-postes-de-carga-con-el-almacenamiento-de-energia\/\"> en 2022<\/a>, que combina dos columnas con electr\u00f3nica de carga y almacenamiento de bater\u00edas en un sistema \"todo en uno\". Complementa a la ChargeBox, que conecta el m\u00f3dulo de refuerzo de la bater\u00eda a dos columnas de carga. ADS-TEC Energy destaca que el ChargePost ayuda a generar ingresos m\u00e1s all\u00e1 de la carga, ya que cuenta con una pantalla opcional de 75 pulgadas para publicidad y ofrece \"fuentes de ingresos adicionales a trav\u00e9s del comercio de energ\u00eda\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.mynewsdesk.com\/adstec-energy\/pressreleases\/tender-awarded-ads-tec-energy-to-supply-battery-based-ultra-fast-chargers-to-q8-3378112\" rel=\"nofollow noopener\" target=\"_blank\">mynewsdesk.com <\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Las soluciones de carga de ADS-TEC Energy ofrecen hasta 320 kW. Gracias a que est\u00e1n equipadas con una bater\u00eda tamp\u00f3n, pueden suministrar este tipo de potencia sin necesidad de grandes ampliaciones de la red.<\/p>","protected":false},"author":29,"featured_media":268267,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[8401,14830,10202,10174,7548,9221,9978,14547],"class_list":["post-268266","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-ads-tec","tag-battery-storage","tag-belgium","tag-charging-stations","tag-dc","tag-hpc","tag-netherlands","tag-q8"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[8401,14547,10174,10202,9978,7548,9221,14830],"post_thumbnail":268267,"post_thumbnail_listing":false,"post_thumbnail-caption":"","post_teaser-text":"ADS-TEC Energy has won a tender to supply more than a dozen ChargePost and ChargeBox systems to Q8 and Tango petrol stations in Belgium and the Netherlands. The battery-buffered fast-chargers can also be installed when grid capacity is limited.","post_advert":false,"post_legacy":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/268266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=268266"}],"version-history":[{"count":2,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/268266\/revisions"}],"predecessor-version":[{"id":268269,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/268266\/revisions\/268269"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/268267"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=268266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=268266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=268266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}