{"id":271199,"date":"2025-05-01T11:00:00","date_gmt":"2025-05-01T09:00:00","guid":{"rendered":"https:\/\/www.electrive.com\/?p=271199"},"modified":"2025-04-30T17:32:27","modified_gmt":"2025-04-30T15:32:27","slug":"skycharger-consigue-una-subvencion-de-10-millones-para-paradas-de-camiones-electricos-en-california","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2025\/05\/01\/skycharger-secures-10-million-grant-for-electric-truck-stops-in-california\/","title":{"rendered":"Skycharger obtiene una subvenci\u00f3n de $10 millones para paradas de camiones el\u00e9ctricos en California"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Los dos emplazamientos, concretamente Kettleman City, CA y Lebec, CA, ofrecer\u00e1n tasas de carga de al menos 200 kW y podr\u00e1n cargar 64 camiones el\u00e9ctricos simult\u00e1neamente. Adem\u00e1s, cada emplazamiento estar\u00e1 equipado con 5,1 MW de energ\u00eda solar y 8 MWh de almacenamiento de energ\u00eda en bater\u00edas para minimizar el impacto en la red y garantizar la operatividad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Como ya se ha mencionado, Skycharger ha recibido una adjudicaci\u00f3n de $10 millones de la Comisi\u00f3n de Energ\u00eda de California (CEC) para construir los dos emplazamientos a lo largo del corredor de la Interestatal 5 en el sur de California.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Anteriormente, el puerto de San Diego encarg\u00f3 a la empresa la construcci\u00f3n de un centro de recarga de camiones el\u00e9ctricos de 70 puertos. \u00c9ste tambi\u00e9n se emparejar\u00e1 con un panel solar (en este caso de 1,75 MW) y un sistema de almacenamiento de energ\u00eda en bater\u00edas (5 MWh).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Agradecemos a la Comisi\u00f3n de Energ\u00eda de California y al Estado de California su apoyo inquebrantable a la electrificaci\u00f3n del transporte, incluidos los camiones pesados\", declar\u00f3 Andy Karetsky, presidente de Skycharger. \"Los camiones el\u00e9ctricos significan aire m\u00e1s limpio, menos ruido, menores costes de explotaci\u00f3n y abundantes beneficios para los trabajadores y las comunidades dondequiera que los camiones viajen y carguen. El futuro sigue siendo el\u00e9ctrico\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El comunicado de prensa no indica cu\u00e1ndo se espera que abran los emplazamientos. Sin embargo, refiri\u00e9ndose a los dos emplazamientos apoyados por la CEC, Skycharger afirma que crear\u00e1n \"m\u00e1s de 90 puestos de trabajo bien remunerados y de \"alto nivel\"\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La iniciativa de Skycharger complementa la normativa sobre flotas limpias avanzadas de California, que obliga a una transici\u00f3n gradual hacia camiones de emisiones cero. Se espera que los primeros dep\u00f3sitos empiecen a construirse en 2025 y que las operaciones comiencen a principios de 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.prnewswire.com\/news-releases\/skycharger-wins-10-million-award-from-california-energy-commission-to-develop-electric-truck-stops-along-i-5-in-southern-california-302441259.html\" rel=\"nofollow noopener\" target=\"_blank\">prnewswire.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Los dos emplazamientos, concretamente Kettleman City, CA y Lebec, CA, ofrecer\u00e1n tasas de carga de al menos 200 kW y podr\u00e1n cargar 64 camiones el\u00e9ctricos simult\u00e1neamente. Adem\u00e1s,<\/p>","protected":false},"author":29,"featured_media":260854,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[9940,10174,7548,11274,9221,31387,31388,12102,30497,609],"class_list":["post-271199","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-california","tag-charging-stations","tag-dc","tag-electric-trucks","tag-hpc","tag-kettleman-city","tag-lebec","tag-north-america","tag-skychargers","tag-usa"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[30497,11274,10174,9940,609,12102,7548,9221,31387,31388],"post_thumbnail":260854,"post_thumbnail_listing":false,"post_thumbnail-caption":"Symbolic Image","post_teaser-text":"Skycharger will set up two public charging hubs for electric trucks in Southern California, an effort supported with funds from the California Energy Commission.","post_advert":false,"post_legacy":false,"post_original_image":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/271199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=271199"}],"version-history":[{"count":2,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/271199\/revisions"}],"predecessor-version":[{"id":271201,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/271199\/revisions\/271201"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/260854"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=271199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=271199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=271199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}