{"id":277025,"date":"2025-07-02T14:30:00","date_gmt":"2025-07-02T12:30:00","guid":{"rendered":"https:\/\/www.electrive.com\/?p=277025"},"modified":"2025-07-02T13:44:05","modified_gmt":"2025-07-02T11:44:05","slug":"espana-abordara-los-retos-de-la-red-de-recarga-de-vehiculos-electricos","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2025\/07\/02\/spain-to-tackle-grid-challenges-to-ev-charging-network\/","title":{"rendered":"Espa\u00f1a abordar\u00e1 los retos de la red de recarga de veh\u00edculos el\u00e9ctricos"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Aunque \u00e9ste ha sido un problema en Espa\u00f1a durante varios a\u00f1os, ahora ha alcanzado un nivel que ha impulsado la acci\u00f3n gubernamental: se ha dado a las compa\u00f1\u00edas el\u00e9ctricas un plazo m\u00e1ximo de 80 d\u00edas para conectar las estaciones de recarga a la red.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Forma parte de un paquete legislativo que incluye otras medidas para reforzar la red el\u00e9ctrica. Los medios de comunicaci\u00f3n espa\u00f1oles informan de que impone otros plazos a los proveedores de energ\u00eda. En el caso de las conexiones de baja tensi\u00f3n, los operadores dispondr\u00e1n ahora de s\u00f3lo cinco d\u00edas para conectar una estaci\u00f3n de recarga a la red, siempre que se cumplan todos los requisitos. Si, por ejemplo, hay que instalar un nuevo centro de transformaci\u00f3n para soportar centros de recarga m\u00e1s potentes, el \"Real Decreto-Ley 7\/2025\" establece un periodo de gracia de 60 d\u00edas; si se necesitan varios, se conceder\u00e1n 80 d\u00edas en su lugar. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Queda por ver si el nuevo decreto resolver\u00e1 realmente el problema o si se topar\u00e1 con dificultades adicionales, por ejemplo, si surgir\u00e1n otros problemas en otras partes de la red el\u00e9ctrica debido a la conexi\u00f3n de clientes adicionales. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sobre el papel, sin embargo, la infraestructura p\u00fablica de recarga de Espa\u00f1a podr\u00eda mejorar dr\u00e1sticamente si los puntos de recarga que a\u00fan no se han conectado se conectan pronto a la red. Si lo hacen, podr\u00eda significar que Espa\u00f1a acabe contando con un total de 59.430 puntos de recarga, un 30% m\u00e1s que antes. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/forococheselectricos.com\/noticias\/gobierno-establece-plazo-80-dias-electricas-conecten-puntos-carga-20250630-37565.html\" rel=\"nofollow noopener\" target=\"_blank\">forococheselectricos.com<\/a> (ES)<\/p>","protected":false},"excerpt":{"rendered":"<p>Aunque \u00e9ste ha sido un problema en Espa\u00f1a durante varios a\u00f1os, ahora ha alcanzado un nivel que ha impulsado la acci\u00f3n gubernamental: se ha dado a las compa\u00f1\u00edas el\u00e9ctricas<\/p>","protected":false},"author":32,"featured_media":276493,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[5755,10174,10040,10050,9221,14744,10157],"class_list":["post-277025","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-ac","tag-charging-stations","tag-europe","tag-grid","tag-hpc","tag-legislation","tag-spain"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[10157,10174,10050,14744,10040,5755,9221],"post_thumbnail":276493,"post_thumbnail_listing":false,"post_teaser-text":"In the first quarter of this year, Spain's publicly accessible charging infrastructure grew by 20 percent up to 46,358 charging points. An additional 13,072 charging points have also been installed but are yet to enter operation, primarily because the power grid cannot support them. Politicians are now taking action. ","post_advert":false,"post_legacy":false,"post_original_image":false,"post_thumbnail-caption":""},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/277025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/32"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=277025"}],"version-history":[{"count":3,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/277025\/revisions"}],"predecessor-version":[{"id":277044,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/277025\/revisions\/277044"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/276493"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=277025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=277025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=277025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}