{"id":279536,"date":"2025-07-28T13:45:50","date_gmt":"2025-07-28T11:45:50","guid":{"rendered":"https:\/\/www.electrive.com\/?p=279536"},"modified":"2025-08-04T07:23:14","modified_gmt":"2025-08-04T05:23:14","slug":"instavolt-construira-un-superhub-de-30-cargadores-en-la-a303-de-wiltshires","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2025\/07\/28\/instavolt-to-build-30-charger-superhub-on-wiltshires-a303\/","title":{"rendered":"InstaVolt construir\u00e1 un supercentro de 30 cargadores en la A303 de Wiltshire"},"content":{"rendered":"<p class=\"wp-block-paragraph\">El proyecto est\u00e1 situado en Chicklade, a diez millas al oeste de Stonehenge, en la finca Fonthill, y est\u00e1 dise\u00f1ado para dar servicio al corredor de la A303, una ruta clave dentro de la Red Estrat\u00e9gica de Carreteras del Reino Unido. El Gobierno y National Highways han dado prioridad recientemente a esta ruta para mejorar la visibilidad de la infraestructura para VE, incluyendo una nueva se\u00f1alizaci\u00f3n para indicar los puntos de recarga disponibles y aumentar la concienciaci\u00f3n entre los conductores de veh\u00edculos no el\u00e9ctricos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Esta tranquila parada se convertir\u00e1 en un destino de recarga vital a lo largo de la A303 -una ruta muy popular y transitada- impulsada por lo \u00faltimo en innovaci\u00f3n en energ\u00eda renovable\", dijo Delvin Lane, CEO de InstaVolt. \"Con 30 cargadores ultrarr\u00e1pidos y una tienda y cafeter\u00eda in situ, Chicklade es el siguiente paso en nuestra misi\u00f3n de combinar escala, sostenibilidad y comodidad\".<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El nuevo emplazamiento sigue el modelo del Superhub de Winchester de InstaVolt e integrar\u00e1 el almacenamiento en bater\u00eda in situ y la generaci\u00f3n solar, lo que permitir\u00e1 periodos de carga con descuento. Este sistema permiti\u00f3 anteriormente a los usuarios de Winchester acceder a la energ\u00eda a tarifas tan bajas como 50 peniques por kWh. El hub se inaugur\u00f3 en marzo y cuenta con huertos solares in situ y 4 MW de \"tecnolog\u00eda punta de almacenamiento en bater\u00eda\" huertos solares in situ y 4 MW de \"tecnolog\u00eda punta de almacenamiento en bater\u00eda\". En aquel momento, el CPO declar\u00f3 que, una vez completado, el huerto solar contar\u00e1 con \"870 paneles solares y el emplazamiento utilizar\u00e1 una mezcla de energ\u00eda solar, almacenamiento en bater\u00edas y energ\u00eda renovable de la red para mantener los cargadores funcionando a una capacidad \u00f3ptima.\"<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El consentimiento de planificaci\u00f3n y la conexi\u00f3n a la red ya est\u00e1n en marcha. InstaVolt ha trabajado con la urbanizaci\u00f3n Fonthill y sus asesores durante dos a\u00f1os para ultimar el proyecto. La construcci\u00f3n comenzar\u00e1 el mes que viene.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/instavolt.co.uk\/exciting-news-instavolt-announces-next-ultra-rapid-charging-hub-on-a303-wiltshire\/\" rel=\"nofollow noopener\" target=\"_blank\">instavolt.es <\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>El proyecto est\u00e1 situado en Chicklade, a diez millas al oeste de Stonehenge, en la finca Fonthill, y est\u00e1 dise\u00f1ado para dar servicio al corredor de la A303, una ruta clave dentro de<\/p>","protected":false},"author":29,"featured_media":279537,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[3701,10174,31716,7548,1742,9221,7495,2158,10802],"class_list":["post-279536","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-bev","tag-charging-stations","tag-chicklade","tag-dc","tag-england","tag-hpc","tag-instavolt","tag-uk","tag-wiltshire"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[7495,9221,2158,7548,10174,31716,3701,1742,10802],"post_thumbnail":279537,"post_thumbnail_listing":false,"post_thumbnail-caption":"","post_teaser-text":"InstaVolt has secured a 40-year lease to develop a major ultra-rapid charging hub with 30 charge points on the A303 in Wiltshire. The site, set to open in spring 2026, will include large-scale solar and battery storage, as well as food and retail amenities from a leading UK operator.","post_advert":false,"post_legacy":false,"post_original_image":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/279536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=279536"}],"version-history":[{"count":2,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/279536\/revisions"}],"predecessor-version":[{"id":280116,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/279536\/revisions\/280116"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/279537"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=279536"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=279536"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=279536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}