{"id":280973,"date":"2025-08-12T12:00:00","date_gmt":"2025-08-12T10:00:00","guid":{"rendered":"https:\/\/www.electrive.com\/?p=280973"},"modified":"2025-08-12T11:24:33","modified_gmt":"2025-08-12T09:24:33","slug":"greenway-instalara-infraestructuras-de-recarga-rapida-en-polonia-y-eslovaquia","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2025\/08\/12\/greenway-to-install-fast-charging-infrastructure-in-poland-and-slovakia\/","title":{"rendered":"GreenWay instalar\u00e1 infraestructuras de recarga r\u00e1pida en Polonia y Eslovaquia"},"content":{"rendered":"<p class=\"wp-block-paragraph\">En concreto, esto significa que GreenWay instalar\u00e1 279 puntos de recarga en 48 localidades de Polonia y 89 puntos de recarga en 20 localidades de Eslovaquia. Est\u00e1 previsto que el 80% de las estaciones suministren hasta 400 kW. Seg\u00fan la empresa, \u00e9sta ser\u00e1 una de las mayores inversiones en infraestructura de recarga de su historia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Con la finalizaci\u00f3n del proyecto, GreenWay habr\u00e1 duplicado la capacidad de su red hasta un total de 75 MW. La empresa tiene previsto poner en funcionamiento la infraestructura a finales de 2025. Ya se han activado las primeras ubicaciones, con nueve emplazamientos en Polonia y otros 23 en Eslovaquia. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La instalaci\u00f3n forma parte de <a href=\"https:\/\/www.electrive.com\/es\/2024\/05\/13\/cross-e-construira-911-nuevos-puntos-de-recarga-hpc-en-ocho-paises-europeos\/\">la iniciativa Cross-E<\/a>cuyo objetivo es instalar infraestructuras de recarga r\u00e1pida en ocho pa\u00edses europeos, y que est\u00e1 cofinanciado por la Uni\u00f3n Europea.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\"Con estas inversiones, estamos construyendo una red que proporciona una recarga r\u00e1pida y fiable. Queremos hacer la vida m\u00e1s f\u00e1cil a los conductores cuando est\u00e1n en la carretera y lejos de su wallbox dom\u00e9stico\", declar\u00f3 Michal Mydlo, Country Manager de GreenWay Eslovaquia, y a\u00f1adi\u00f3: \"Coordinar la construcci\u00f3n de dos docenas de emplazamientos en distintas partes de Eslovaquia manteniendo al mismo tiempo la plena funcionalidad de la red fue un reto para toda la empresa. Estoy orgulloso de que consigui\u00e9ramos completar el proyecto sin concesiones y dentro del plazo establecido.\"<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Fuente: Informaci\u00f3n por correo electr\u00f3nico<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>En concreto, esto significa que GreenWay instalar\u00e1 279 puntos de recarga en 48 localidades de Polonia y 89 puntos de recarga en 20 localidades de Eslovaquia. El 80% de<\/p>","protected":false},"author":22,"featured_media":280988,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[30049,7548,10040,2707,9221,11240,12522],"class_list":["post-280973","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-cross-e","tag-dc","tag-europe","tag-greenway","tag-hpc","tag-poland","tag-slovakia"],"acf":{"post_article-format":{"value":"standard","label":"Standard"},"post_categories":[9933],"post_tags":[2707,11240,12522,9221,7548,10040,30049],"post_thumbnail":280988,"post_thumbnail_listing":false,"post_thumbnail-caption":"","post_teaser-text":"As part of the EU-funded Cross-E project, GreenWay will install a total of 368 new HPC charging points at 68 locations in Poland and Slovakia by the end of 2025.","post_advert":false,"post_legacy":false,"post_original_image":false},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/280973","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=280973"}],"version-history":[{"count":3,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/280973\/revisions"}],"predecessor-version":[{"id":280993,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/280973\/revisions\/280993"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/280988"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=280973"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=280973"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=280973"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}