{"id":90407,"date":"2018-03-14T20:00:17","date_gmt":"2018-03-14T19:00:17","guid":{"rendered":"https:\/\/www.electrive.com\/?p=90407"},"modified":"2018-03-15T09:38:14","modified_gmt":"2018-03-15T08:38:14","slug":"greenway-polska-a-alta-potencia-carga-polonia","status":"publish","type":"post","link":"https:\/\/www.electrive.com\/es\/2018\/03\/14\/greenway-polska-to-high-power-charge-poland\/","title":{"rendered":"GreenWay Polska a la carga de alta potencia Polonia"},"content":{"rendered":"<p>GreenWay Polska ha firmado un acuerdo con la empresa de transportes de Gda\u0144sk para colocar paradas de carga ultrarr\u00e1pida de hasta 350 kW a lo largo de la autopista A1 en Polonia. Las paradas de carga pasar\u00e1n a formar parte de la red GreenWay a partir de principios de 2019.<!--more--><\/p>\n<p>La tecnolog\u00eda de carga ultrarr\u00e1pida de GreenWay puede proporcionar hasta 350 kW de potencia a la vez y cargar hasta seis veh\u00edculos simult\u00e1neamente. El elevado flujo de energ\u00eda se controla mediante un sistema de gesti\u00f3n de la energ\u00eda y la capacidad interna de cada veh\u00edculo, afirma la empresa.<\/p>\n<p>Rafa\u0142 Czy\u017cewski, director general de GreenWay Polska, afirma: \"Ya contamos con varias estaciones de recarga r\u00e1pida en la A1, que se complementar\u00e1n con las estaciones ultrarr\u00e1pidas. Las planeamos principalmente en las intersecciones con otras autopistas, y en la A1 entre la Tri-City y \u0141\u00f3d\u017a, en las dos \u00e1reas de descanso de Malankowo gestionadas por la Compa\u00f1\u00eda de Transportes de Gda\u0144sk.\"<\/p>\n<p>Las primeras estaciones de este tipo aparecer\u00e1n en la red de GreenWay en 2019. Para 2020, GreenWay Polska tiene previsto instalar un total de 200 estaciones de carga, incluidos 10 cargadores ultrarr\u00e1pidos y 135 r\u00e1pidos para coches el\u00e9ctricos.<\/p>\n<p><a href=\"https:\/\/www.electrive.com\/media\/2018\/03\/2018-03-GreenWay.pdf\" target=\"_blank\" rel=\"noopener\">electrive.com<\/a> (PI como pdf)<\/p>","protected":false},"excerpt":{"rendered":"<p>GreenWay Polska ha firmado un acuerdo con la empresa de transportes de Gda\u0144sk para colocar estaciones de recarga ultrarr\u00e1pida de hasta 350 kW a lo largo de la autopista A1 en Polonia. El sitio<\/p>","protected":false},"author":21,"featured_media":90351,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9933],"tags":[10174,14121,2707,8586,9221,11240,14122],"class_list":["post-90407","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-infrastructure","tag-charging-stations","tag-gdansk-transport-company","tag-greenway","tag-high-power-charging","tag-hpc","tag-poland","tag-rafal-czyzewski"],"acf":{"inhalt_teil2":""},"_links":{"self":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/90407","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/comments?post=90407"}],"version-history":[{"count":0,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/posts\/90407\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media\/90351"}],"wp:attachment":[{"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/media?parent=90407"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/categories?post=90407"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.electrive.com\/es\/wp-json\/wp\/v2\/tags?post=90407"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}