The end of range anxiety in Europe.

FastE-Buzzer300The Fast-E project by charge point operator (CPO) Allego wants to install a total of 278 fast-chargers in Germany and Belgium by June 2017. The first 28 locations (21 in Germany and 7 in Belgium) are already online. As for the remaining 250 chargers, Allego is confident that it will be able to set them up before next summer, if not earlier, our editor Carla Westerheide reports.
Read more on electrive.com >>

Tags

0 Comments

about „The end of range anxiety in Europe.“

Leave a Reply

Your email address will not be published. Required fields are marked *

Also read