Tag: Bitterfeld-Wolfen

May 4, 2022 - 04:09 pm

Bitterfeld-Wolfen is cancelling contract with Farasis

The planned battery cell factory of Daimler partner Farasis Energy in Bitterfeld-Wolfen (Saxony-Anhalt) is probably not going to happen. According to a German media report, Bitterfeld-Wolfen has terminated the urban development contract with Farasis Energy Europe. The company has confirmed the move but the connection has not been completely cut.

Weiterlesen
Jul 12, 2021 - 11:04 am

Farasis battery production in Saxony delayed

According to a media report, the start of battery cell production by Daimler partner Farasis Energy in Saxony-Anhalt will be delayed by two and a half years from April 2022 to October 2024. The background to this is that Farasis is currently pooling all its resources to get its existing factories in China up and […]

Weiterlesen
Apr 21, 2021 - 02:25 pm

AMG Lithium to build lithium hydroxide plant in Germany

AMG Lithium GmbH, a subsidiary of the Dutch Advanced Metallurgical Group (AMG), has acquired a plot of land in the Bitterfeld-Wolfen Chemical Park. A lithium hydroxide plant is to be built there by 2023, not far from the planned battery plant of Daimler partner Farasis.

Weiterlesen

– ADVERTISEMENT –

coperion

Found on electrive.com
https://www.electrive.com/2022/05/04/bitterfeld-wolfen-is-cancelling-contract-with-farasis/
04.05.2022 16:57